retaining walls
- type depends on force to withstand + appropriateness.
- Sheared ground > 1.2m deep to be retained
Surveying
- resection = 'free' surveying so long as at least 2 targets visible. more for greater accuracy
BCC specs as well as clients/ utilties to be considered.
Types of contract(See contracts DOC)
- NEC3 contract
- NCR(non conformance report)
- consultant/(The Engineer) assesses construction site, sends NCR if any deficiency
- Acceleration = project CAN be completed faster but needs to be agreed on how to with client
- NCR(non conformance report)
- JCT(Joint contracts tribunal)
- ICE conditions contract
- NEC3 contract
RAMS(Risk assessment + method statement)
- RAMS given from sub. to main->reviewed-> sent back if inadequate.
- template useful to ensure consistency between sub. and contractor- MUST be explicit and specific to task
- must consider all stakeholders
Permits
- hots works/confined spaces/disturb ground
Informações