TC#22_Met_Selección_Proyectos

  1. Benefit measurement methods

    • economic models
      • Present Value
        • PV= FV / (1+R)²
        • the value today of future cash flows
      • Net presente value
        • NPV - NET PRESENT VALUE
        • accept > value
        • the present value of the total benefits minus the costs over many time periods
      • Internal rate of return
        • IRR - INTERNAL RATE OF RETURN
        • accept > value
        • the rate (read as interest rate) at which the project inflows (revenue) and project outflows (cost) are equal
      • Cost-benefit analysis
        • compares the costs of the project with the benefits
      • Payback period
        • accept < time
        • the lenght of time it takes for the organization to recover its investment in the project before is starts accumulating profit
    • murder board
    • peer review
    • scoring models
  2. constrained optimization methods

    • linear programming
    • integer programming
    • dynamic programming
    • multi-objective programming

Información

Descripción
Mapa Mental sobre TC#22_Met_Selección_Proyectos, creado por wg.resendiz el 20/01/2016.
Creado por
wg.resendiz
Visitas
3
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?