¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

MODEL CONSTRUCTION PROCESS

Lina Ariza Ingeniería Español

MODEL CONSTRUCTION PROCESS

Contenido del mapa

MODEL CONSTRUCTION PROCESS

  1. 1. Formulate the Problem

    • Minimize the cost of operating CITGO’s refineries.
      • 1 Where should crude oil be purchased?
      • 2. Where should products be sold?
      • 3 What price should be charged for products?
      • 4 How much of each product should be held in inventory?
  2. 2. Observe the System

    • The refinery was observed for an estimated time
      • A database was installed
      • Control and elaboration of Pronostico
  3. 3. Formulate a Mathematical Model of the Problem

    • Model was developed to optimize refinery operations.
      • Cost minimization
      • Inputs to produce the desired outputs
      • Restrictions
  4. 4. Verify the Model and Use the Model for Prediction

    • Data collection and comparison for one month
      • Are continuously evaluated to ensure that they continue to provide accurate forecasts
  5. 5. Select a Suitable Alternative

    • Yielded a daily strategy for running the refinery
      • A minimum cost network flow model (MCNFM)
  6. 6. Present the Results and Conclusion

    • Running the LP
      • The Supply Distribution Marketing (SDM) System
  7. 7. Implement and Evaluate

    • The model was used
      • Organizational Changes
      • Combination of departments C
      • ommunication improvements
  8. OPTIMIZING OPERATIONS

  9. MINIMIZE THE COST OF OPERATING

Imágenes y archivos del mapa

  • MODEL CONSTRUCTION PROCESS
  • MODEL CONSTRUCTION PROCESS

Información

Descripción
Ingeniería Mapa Mental sobre MODEL CONSTRUCTION PROCESS, creado por Lina Ariza el 15/03/2017.
Creado por
Lina Ariza
Visitas
0
Historial
  • Creado por Lina Ariza · 15 mar 2017
  • Copiado por Lina Ariza · 15 mar 2017
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?