Mind map
MODEL CONSTRUCTION PROCESS

Map content
MODEL CONSTRUCTION PROCESS
1. Formulate the Problem
- Minimize the cost of operating CITGO’s refineries.
- 1 Where should crude oil be purchased?
- 2. Where should products be sold?
- 3 What price should be charged for products?
- 4 How much of each product should be held in inventory?
- Minimize the cost of operating CITGO’s refineries.
2. Observe the System
- The refinery was observed for an estimated time
- A database was installed
- Control and elaboration of Pronostico
- The refinery was observed for an estimated time
3. Formulate a Mathematical Model of the Problem
- Model was developed to optimize refinery operations.
- Cost minimization
- Inputs to produce the desired outputs
- Restrictions
- Model was developed to optimize refinery operations.
4. Verify the Model and Use the Model for Prediction
- Data collection and comparison for one month
- Are continuously evaluated to ensure that they continue to provide accurate forecasts
- Data collection and comparison for one month
5. Select a Suitable Alternative
- Yielded a daily strategy for running the refinery
- A minimum cost network flow model (MCNFM)
- Yielded a daily strategy for running the refinery
6. Present the Results and Conclusion
- Running the LP
- The Supply Distribution Marketing (SDM) System
- Running the LP
7. Implement and Evaluate
- The model was used
- Organizational Changes
- Combination of departments C
- ommunication improvements
- The model was used
OPTIMIZING OPERATIONS
MINIMIZE THE COST OF OPERATING
Images and files in the map
Information
- Description
- Ingeniería Mind Map on MODEL CONSTRUCTION PROCESS, created by Lina Ariza on 15/03/2017.
- Created by
- Lina Ariza
- Views
- 0
- History
-
- Created by Lina Ariza · Mar 15, 2017
- Copied by Lina Ariza · Mar 15, 2017
- Rating
