Construction Law

Ruben De Leon Inglés

Mind map about Construction Law and Contract Issues: Surety Bond, Indemnification, Safety, and Claims

Mind map: Construction Law and Contract Issues

Contenido del mapa

Construction Law

  1. Class 10

    • Design professional as judge
      • Initial Decision Maker (IDM)
        • Condition of construction contract
          • Historical accident/ most efficient alternative
        • New project position
          • Arbiters
          • Indépendant disputé resolution board
            • Owner picks, contractor picks, members on board pick last
        • Initial Decision
          • Selection of IDM
            • If you don't select someone judges are selected
          • IDM Actions
            • reject approve request info suggest compromise describing architects decision for claim
          • Form of Decision
          • Finality
            • Unless
              • Disagreement
            • Mike m Johnson
        • IDM Actions
        • Renders Decisions
        • Architect unless other selection
      • Historical Responsibilities
        • Determine contractors compliance
        • Initial Arbiter of Disputes
          • Owner v Contractor arch decides winner
        • Designers know design
      • Interpretation
      • Finality of Decisions
    • Construction dispute resolution
      • Court System
        • Alternative Dispute Resolution
          • Mediation
            • Favored by courts
            • Non-binding
              • Not for a decision, nobody wins
            • Condition precedent to litigation
          • Arbitration
            • Binding
            • Private form of litigation
            • Under AIA Doc
            • Rules
              • Civil Procedure
                • Evidence don't apply
              • AAA Construction Arbitration
                • Regular Track
                • Fast Track
            • Issues
              • Timeline of Demand
                • Statute of repose, statute of limitations
              • Arbitrator Jurisdiction
            • Revised Uniform Arb Act.
              • Industry group wrote statutes that uniformly ....like a court decision
            • Court or Arbitration?
              • Valid, Enforceable, and irrevocable
              • Disputes
                • Is the case arbitrable
                  • Pamco
                    • Any dispute between two is arbitrable
                    • Claim involves the owner
                    • Court
                      • Close call, will not decide merits
            • Selection
              • Impartially
              • RCW 7.04A.120
                • Disclosures by arbitrator
            • Joinder and Consolidation
              • Contract
                • AIA A201-2007:: §15.4.4
              • Court order
                • RCW 7.04A.100
                • Consolidation of separate arbitration proceedings
                  • Three party dispute
                    • Risk of adverse decision is eliminated
                    • Most efficient
              • Architect brings owner into arbitration
            • Hearing
              • Subpoena Powers
              • Legal rules of evidence
              • Ex parte Communications
              • Substantive Standards
              • Remedies
                • Money
                • Damages
                • Performance
              • No judge, present evidence
                • you get a decision
                  • Mutual agreement
            • better for cases that have lower stakes
          • Through contract only
      • If contract says nothing
    • Surety Bond
      • Terminology
        • Surety
          • protects owner
        • Principle
        • Obligee
      • Bond Types
        • Bid
        • Performance
        • payment
        • Subcontractor
        • Public Works bond
        • Registration
      • Who can Sue
        • Performance
        • Payment
        • WA public works bond
        • WA Contractors bond
    • Termination of Construction Contract
      • Termination
        • Drastic
        • Risky
      • Agreement of the parties
        • by the contractor
          • Notice requirement
        • by the owner for convience
          • Suspension
            • Payment to contractor
              • T for C
                • Owner stops paying,
                • Damages
              • reasonable overhead and profit
          • Termination
          • owner does not want to continue with project
        • By the owner for Cause/Default
    • Contractors compliance with contract Docs.
      • Architects less controversial role
        • Interpret/decide concerning contractors performance
      • Fairness
        • Based on actually contract, decision
          • Arch will not show favoritism
            • Money may pose difficult enforcing
      • Aesthetics
      • Who Pays?
        • Contractor
          • when contrary to archs request
          • Contrary to contract documents
        • It depends
          • Contractor covers work
            • Architect requests it be uncovered
  2. Class 9

    • Construction Related Accidents
      • Workers Compensation Laws
        • Title 51 RCW
          • Idustrial Insurance
            • Sure and Certain relief for workers
            • Employer Immunity
              • may be asked to be waived
        • RETRO - WA's Retrospective Rating
          • Optional
          • Potential to reduce industrial insurance costs
        • WA Department of Labor and Industries
          • Limited benefits
      • Responsibility for Safety
        • General Contractor
          • non-delegable duty for safety
            • Control
            • General Duty
            • Specific Duty
          • Primary Responsibiliy for safety
        • Owner
        • Subcontractor
          • Hennig v Crosby Group
          • Concurrent duty
            • Statutory/Contractual
            • RCW Title 51 Immunity
          • Jones v. Halvorson-Berg
            • Loaned Servant/ Control
      • Standard of Conduct
        • Avoid unreasonable risk of harm
        • Statutory Safety Laws
          • Occupational Safety and Health Act of 1970
          • WA Industrial Safety and Health Act of 1973
            • OSHA Approved
            • Most all contractors
    • Indemnification
    • Subcontracting
      • Bidding Process
        • Subcontractors Bid
          • Snap Up Doctrine
        • Bid Shopping/peddling
          • Subcontractor Listing
          • McCandish v WIll Const
          • RCW 39.39.060
          • A201 § 5.2.1
      • Rights and Duties
        • Prime Contract incorporated by reference
          • Conduit/ Flowdown cause
          • General v Specific Purpose
            • 15 Day Notice Requirement
      • Standard-from Subcontracts
        • Contracts
          • Risk allocation tools
            • Price reflects allocation
        • Std. Forms
          • AIA A401-2007
          • ConsensusDOCS 750
          • AGC of WA's revised form
        • Watch for Modification
        • Modifications
          • May have removal of rights
          • May have created internal ambiguity
      • Payment Claims
        • Issues
          • Unjust Enrichment, Double payment, Forfeiture
          • Waiver of claims
            • Lien Releases
            • Acceptance of final Payment
        • Prompt Payment from GC
          • AIA A401
            • 7 Days
        • Retention
          • RCW 60.28.011 for Public Works
        • Private Work
          • Chapter 60.04 RCW
      • Mechanics Liens
        • Private work
          • Chapter 60.04 RCW
        • Public Works
          • Claim on Payment Bond
          • Lien on Retention Fund
          • Pre-lien Notice
    • Contribution and Indemnifaction
      • Contribution
      • Indemnity
        • Types
          • Tort
          • Implied Contractual
  3. FINAL

    • ECONOMIC LOSS
    • INDEPENDANT DUTY
      • NEGLIGENCE
    • WARRANTY
    • PUBLIC BIDDING
    • SAFETY
    • Difffereing Site Conditions
    • Copyright
  4. Class 8

    • Defects
      • Claims
        • Owner vs Contractor
          • Only construction defect, not design
            • Except on Design build
      • Responsibility follows control
        • Owner has control over design
        • Contractor has control over means and methods
      • Risk Shifting
        • Freedom of Contract
      • Good Faith/Fair Dealing
        • Duty Implied in every contract
        • Duty to warn
          • facilitating coordination, construction shall make notice of discoveries that
      • Project Acceptance
        • Waiver of claim for defects
        • Payment by owner not acceptance
          • Final payment does not waive claims for defective construction
      • Responsibility
        • Divided Responsibility
          • Courts may apportion damages
      • Third Party Claims
        • Comparative fault
        • Personal Injury or Property damage
      • Contractors Commercial General Liability
        • Requirements
        • Coverage Denial
          • Bad faith
        • Does not cover defective work
          • Covers damage to property caused by work
        • Language
          • Coverage determined by language
          • Standard Language ends coverage after Final payment
            • *completed operations coverage required by owner
    • Subsurface Problems
      • DSC Claims
        • Type 1
          • Site conditions differ from those indicated contract
          • Equitable adjustment
            • Provided by owner
            • Contract indicated conditions at site; Conditions indicated differed materially from actual conditions;
            • Actual conditions were reasonably unforeseeable; Contractor prudently interpreted contract documents; Contractor reasonably relied on its interpretation; and Contractor incurred additional costs
        • Type 2
          • Equitable adjustment
            • Contractor did not know about actual condition at site;
            • Contractor could not reasonably have anticipated; and
            • Actual condition varied from the norm.
          • Conditions encountered at the site differ materially from those normally encountered
      • Risk Allocation plans
        • Owner bears risk of failure to accommodate soil conditions
          • New Rule
    • Time
    • Claims

Información

Descripción
Mapa Mental sobre Construction Law, creado por Ruben De Leon el 31/05/2017.
Creado por
Ruben De Leon
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?