¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

Water collection

Sara Hannigan WRE Inglés

Contenido del mapa

Water collection

  1. sewer systems

    • Combined sewer systems
      • carries both foulwater and stormwater
      • only one pipe is required and its capacity needs to be little more than that of a storm sewer system
      • disadvantage is that large quantities of polluted water (a mixture of stormwater and foulwater) must be bypassed to watercourses during storm events to avoid overloading sewage treatment works
    • separate systems
      • higher initial capital costs
      • foulwater is conveyed to the treatment works for purification before discharge to a watercourse, while the stormwater is discharged directly to a receiving water through the storm sewer system
      • necessary to have at least one open vent
        • The vent pipe ensures that the pressure within the domestic drainage system does not fall below atmospheric pressure and so risk water being siphoned from sanitary fixtures.
        • In addition, the vent pipe assists in ventilating the public sewer and prevents foul air from the sewer entering the internal building foul drainage system.
  2. Design considerations

    • normally flow partially full and therefore rely on pipe gradient to convey the wastewater along the pipe
      • sewers must be adequate in size and gradient, so that they will carry the maximum (design) flow without being surcharged
    • minimum cleansing velocities
      • to prevent the deposition of solids in the sewer system at low flows
    • If adequate gradient is not available due to ground topography, the wastewater is normally collected by gravitational flow to some convenient low-point, from where it is pumped
    • material must be selected so as to be capable of withstanding external loading
    • selection of pipe material
      • wastewater must not be aggressive to the wall of the sewer
    • manhole covers every 100- 150m
  3. waste water flows

    • dry weather flow (DWF) is approximately equal to the flow of drinking water supplied to an area
      • 225 litres/head/day
    • designed to cater for 3 DWF
    • combined sewer systems
      • much lower potential for polluting watercourses
      • foul water very diluted
      • 6 DWF
        • to ensure that, under storm conditions, the most polluting component of the wastewater (frequently termed the ‘first foul flush’) is transported to a treatment works
        • The remaining stormwater flow (which could be large as 40 DWF) is generally ‘offloaded’ from the sewer system by means of storm overflows to adjacent watercourses
        • Under storm conditions, about 3 DWF of the incoming 6 DWF is temporarily stored on site in balancing tanks until the storm abates
  4. storm sewer design

    • influencing factors
      • rainfall
      • catchment
      • sewer network
    • starting size of pipe
      • 150 mm in diameter
    • flow velocities
      • not too high to be abbrasive
        • max 3.5 m/s
      • not too low so solids are deposited
        • 0.75m/s
      • 3DWF
        • 675 litres/head/day
  5. Pumping stations

    • dry well suction pump
      • installed in a dry chamber or well, adjacent to the wet-well (also referred to as the pump sump)
      • wet-well serves to equalise the incoming flow, which is always variable
      • advantage
        • configuration is the relatively greater facility for inspection and maintenance
    • submerisable pump
      • Both the pump and the motor are housed in a waterproof casing
        • submerged in the liquid being pumped
      • disadvantage
        • maintenance of the pump-motor assembly is a more disagreeable task
  6. storm overflows

    • frequently result in watercourses being polluted by untreated sewage
    • storm flow characteristics
      • should not come into operation until the prescribed flow is being passed to treatment
      • flow to treatment should not increase significantly as the amount of overflowed storm sewage increases
      • maximum amount of polluting matter should be retained in the forward flow to treatment
      • chamber should be so designed as to minimise turbulence and risk of blockage
      • hould be self-cleansing and require the minimum of maintenance

Información

Descripción
WRE Mapa Mental sobre Water collection, creado por Sara Hannigan el 21/02/2018.
Creado por
Sara Hannigan
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?