Ayúdanos a dar forma a GoConqr. ¿Qué deberíamos añadir?

Mapa mental

PRODUCTION PART APPROVAL PROCESS (PPAP)

Antonio Fuentes Español

Contenido del mapa

PRODUCTION PART APPROVAL PROCESS (PPAP)

  1. 1. Design Records

    • A copy of the drawing.
  2. 2. Authorized Engineering Change Documents

    • A document that shows the detailed description of the change.
  3. 3. Customer Engineering Approval

    • This approval is usually the Engineering trial with production parts performed at the customer plant.
  4. 4. Design Failure Modes and Effects Analysis (DFMEA)

    • A copy of the Design Failure Mode and Effect Analysis (DFMEA), reviewed and signed-off by supplier and customer.
  5. 5. Process Flow Diagram

    • A copy of the Process Flow, indicating all steps and sequence in the fabrication process, including incoming components.
  6. 6. Process Failure Modes and Effects Analysis (PFMEA)

    • The PFMEA follows the Process Flow steps, and indicate “what could go wrong” during the fabrication and assembly of each component.
  7. 7. Control Plan

    • It provides more details on how the “potential issues” are checked in the incoming quality, assembly process or during inspections of finished products.
  8. 8. Measurement System Analysis (MSA)

    • MSA usually contains the Gage R&R for the critical or high impact characteristics, and a confirmation that gauges used to measure these characteristics are calibrated.
  9. 9. Dimensional Results

    • A list of every dimension noted on the ballooned drawing.
  10. 10. Records of Material / Performance Test Results

    • A summary of every test performed on the part.
  11. 11. Initial Process Studies

    • Usually this section shows all SPC charts affecting the most critical characteristics.
  12. 12. Qualified Laboratory Documentation

    • Copy of all laboratory certifications of the laboratories that performed the tests reported on section 10.
  13. 13. Appearance Approval Report (AAR)

    • A copy of the AAI (Appearance Approval Inspection) form signed by the customer. Applicable for components affecting appearance only.
  14. 14. Sample Production Parts

    • A sample from the same lot of initial production run. The PPAP package usually shows a picture of the sample and where it is kept (customer or supplier).
  15. 15. Master Sample

    • A sample signed off by customer and supplier, that usually is used to train operators on subjective inspections.
  16. 16. Checking Aids

    • When there are special tools for checking parts, this section shows a picture of the tool and calibration records, including dimensional report of the tool.
  17. 17. Customer-Specific Requirements

    • Each customer may have specific requirements to be included on the PPAP package.
  18. 18. Part Submission Warrant (PSW)

    • This is the form that summarizes the whole PPAP package. This form shows the reason for submission (design change, annual revalidation, etc.) and the level of documents submitted to the customer.

Información

Descripción
Mapa Mental sobre PRODUCTION PART APPROVAL PROCESS (PPAP), creado por Antonio Fuentes el 30/03/2020.
Creado por
Antonio Fuentes · mar 2020
Actualizado
30 mar 2020
Visitas
2
Valoración

Más sobre Quality Planning and Quality Function Deployment

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué deberíamos añadir?