Mapa mental
System Analysis_3

Mind map: System analysis
Contenido del mapa
System Analysis_3
Clockwise cycle
- Fact Finding
- Feasibility Study
- Analysis Phase
- System Design
- Testing
- Implementation
- Documentation
- Evaluation
- Did the system met its objectives? Can it be further improved?
- The new system have to be assessed and suggestions and feedback form users should be taken into consideration for further improvements of the system.
- After testing is done successfully
- Did the system met its objectives? Can it be further improved?
- User documentation
- Used to explain to the user how to use the system. It is presented as a user guide to the user
- Items found
- -Screenshots of the user interface
- -Step by step instructions on how to launch and operating the system
- -Screenshots of the user interface
- Items found
- Used to explain to the user how to use the system. It is presented as a user guide to the user
- Technical documentation
- A report to allow users to alter/upgrade the system in the future. Troubleshooting can also be done
- Items found
- -System flowcharts
- -File structures
- -Pseudocodes
- -File structures
- -System flowcharts
- Items found
- A report to allow users to alter/upgrade the system in the future. Troubleshooting can also be done
- Evaluation
- How the new system will be implemented
- Direct Implementation
- New system replaces the old system entirely
- Users will immediately enjoy the benefits of the new system.
- Advantage
- Users unfamiliar with the new system and will find difficulties coping the sudden change.
- New system may have major errors
- Disadvantages
- New system may have major errors
- Users will immediately enjoy the benefits of the new system.
- New system replaces the old system entirely
- Phased Implementation
- Parts of old system slowly replaced by the new one. It will take a longer time in order to make sure every part works before the next begun
- System can be tested for errors before the full implementation
- Advantage
- Take a longer period of implementation which results in the full benefits being delayed
- Disadvantages
- System can be tested for errors before the full implementation
- Parts of old system slowly replaced by the new one. It will take a longer time in order to make sure every part works before the next begun
- Parallel running
- New system implemented alongside with old system to check whether it works. If new systems fails, old system will be a backup. After all problems solved, old system is discarded
- User can fall back on the old system if new system fails
- Advantages
- Since each job is done twice, there is more work for users when both system is running simulataneously
- Disadvantages
- User can fall back on the old system if new system fails
- New system implemented alongside with old system to check whether it works. If new systems fails, old system will be a backup. After all problems solved, old system is discarded
- Direct Implementation
- Documentation
- The process of testing is to check whether the new system functions works as expected with both normal usage and potential problems
- Types of input data
- Normal data
- See if inputing correct values will achieved expected results
- Example
- If question request to input month
- The user will be required to type in any value range from (1-12)
- such as 4 for the month of April
- The user will be required to type in any value range from (1-12)
- If question request to input month
- Example
- See if inputing correct values will achieved expected results
- Abnormal data
- Check for validation and error-checking routines
- Example
- If question request to input month
- The user will be required to type any outside the range or unacceptable values
- Such as -5 which is not a possible month number
- The user will be required to type any outside the range or unacceptable values
- If question request to input month
- Example
- Containing errors
- Check for validation and error-checking routines
- Extreme data
- To make sure validation works and calculations cope with a very large or small number
- Example
- If question request to input month
- The user will be required the edges of acceptable range such as the maximum or minimum
- Such as 1 or 12 which is acceptable as it represents January and December
- The user will be required the edges of acceptable range such as the maximum or minimum
- If question request to input month
- Example
- To make sure validation works and calculations cope with a very large or small number
- Normal data
- Types of input data
- Implementation
- Include:
- -The file structure and tables
- -The hardware and software requiremen
- -The required outputs
- -The required inputs
- -What data protection is needed
- -The required inputs
- -The required outputs
- -The hardware and software requiremen
- -The file structure and tables
- Testing
- Include:
- -The proposed system objective
- Any constraints or limitations
- -The drawing of system florcharts and data flow charts
- Any constraints or limitations
- -The proposed system objective
- System Design
- The aim of a feasibility study is to see if it is possible to devise a system that can be implemented and that will work at a reasonable cost
- It will include:
- -A description of the tasks the system is required to do
- -An initial cost of the system
- -The benefit of the system
- -Alternative designs so that the most appropiate can be chosen
- -The benefit of the system
- -An initial cost of the system
- -A description of the tasks the system is required to do
- It will include:
- Analysis Phase
- Find facts about present/existing systems
- Can be found by:
- -Asking Questions
- -Questionnaires
- -Observation
- Inspection
- -Observation
- -Questionnaires
- -Asking Questions
- Can be found by:
- Feasibility Study
- Fact Finding
Información
- Descripción
- Mapa Mental sobre System Analysis_3, creado por xshuyj el 01/10/2015.
- Creado por
- xshuyj
- Visitas
- 7
- Historial
-
- Creado por Muhd Asyraf Bin Azma · 1 oct 2015
- Copiado por xshuyj · 1 oct 2015
- Valoración
Más sobre System Implementation and Changeover