¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

Principles of camp siting

lashed_126 Inglés

Mind map on principles of camp siting: topography and location, soil type, availability of water and camp layout

Mind map: Principles of camp siting

Contenido del mapa

Principles of camp siting

  1. Safe comfortable environment

  2. Make the best use of available area

    • Camp layout in a grid system Set boundary Grid can be expanded Avoid area used by troops less than 2 mths before
    • Area and real estate available
      • Enough space and future expansion
  3. Topography and location

    • Towns and local inhabitants Wind Space for expansion Duration
    • Look for a gentle slope Natural drainage Consider flood hazards Avoid flat areas and swamps
    • Environmental impact
  4. Soil type

    • Sanitation Water pipelines Road and construction Living environment (dust, mud) High water table problems (latrines etc)
  5. Availability of water

    • Water source as close to camp as possible Quality and quantity Type of source
  6. Access

    • Approaches (metalled roads) Main traffic route Vehicles, weight limits Camp circuit
    • Logistics supply
      • Air drop - allows supply to remote areas, expensive and requires large scale support Road - security issues for convoy but allows cheaper and more accurate supply
  7. Vegetation

    • May require fuel for cooking Wood and grass for shelter Vector problems
    • Utilising existing facilities
      • Tactical considerations Duration Construction type Safety of facility Size of buildings Information about facility Drainage Power supply Water supply Removal of bodies Booby traps etc
  8. Environmental heath hazards

    • Vector borne diseases Use of rivers for bathing and laundry Pests Over crowding Catering Climate
  9. Political and security issues

  10. Social, legal and cultural issues

  11. Camp layout

    • Facing prevailing wind Sleeping accommodation at the front Sanitary facilities downwind Night sanitation appliances Ablutions downstream of water point Communications Work areas
  12. Immediate action points

    • Localise defecation Develop appropriate exceta disposal system Establish inspection and reporting system Establish effective services for disposal of other waste
  13. Waste disposal requirements

    • Must be easy to keep clean Hand washing Fly proofing Degree of privacy At least 30m from ground water sources At least 1.5m from water table Must be accessible Security

Información

Descripción
Principles of camp siting
Creado por
lashed_126
Visitas
161
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?