Mapa mental
SCRUM
Contenido del mapa
SCRUM
- 5 Values 3 Roles 4 Ceremonies 3 Work Products
Sprint
- (2-6 Weeks) Sprint Iteration/Cycle: Each time all the assigned tasks are completed, and/or assigned due date has expired.
- Meetings
- All the meetings that happen at each Sprint iteration
- Sprint Planning
- (4 hrs) This meeting is done at the beginning of each Sprint iteration. SM & Team pick Epic Stories that will later be broken down into User Stories and assign them to Teams
- Daily SCRUM
- (15 mins Daily) Meetings that discuss any issue/inquiry that the team is having in their particular task assigned.
- Sprint Review
- (A total of 4 hrs) This meeting is done at the end of each Sprint iteration.
- Show & Tell
- (2 hrs) Team does a Demo of the User Story completed
- Sprint Retrospective
- (2 hrs) A review or open discussion for comments, suggestions, and/or questions regarding the entire Sprint iteration
- Documents
- All sets of documents used during Sprint iterations
- Product Backlog
- A Document designed for the Product Owner and the SCRUM Master
- Sprint Backlog
- A Document designed for SCRUM Master and the Team. After a Sprint iteration is done, a new Sprint Backlog is created.
- Burn Down Chart
- Used to keep track of User Stories during Sprint. After a Sprint iteration is done, a new Sprint Backlog is created.
- Stakeholders
- People/Groups that Participate in the entire process of SCRUM methodology
- PO
- Product Owner: They create a Product Backlog (BRD or SRS) with the SCRUM Master(s)
- SM
- SCRUM Master: It is a type of project manager that ensures and executes all the SCRUM methodologies. There can be multiple SCRUM Masters along the entire project. Hierarchy between SCRUM Masters
- Team
- (5-9 people) Multiple Teams Scrum of Scrums
Información
- Descripción
- Certificate (Software Engineering) Information Technology Mapa Mental sobre SCRUM, creado por R A el 20/01/2016.
- Creado por
- R A · ene 2016
- Actualizado
- 6 abr 2018
- Visitas
- 292
- Etiquetas
- Valoración