IAS 16 - PPE
Contenido del apunte (1)
Página 1
PPE Initial recognition :
R - RESOURCE - When it’s probable that we will get future economic benefits
C - CONTROL - When we control the asset
C - COST - When the asset’s cost can be measured reliably
COST OF THE ASSET :
1. site preparation, delivery and handling, installation, related professional fees for architects and engineers
2. Dismantling costs - PRESENT VALUE
Dr Asset
Cr Liability
Discount the costs and unwind the cost (using discount rate) every year
PV x Discount rate
Dr interest (with unwinding of discount)
Cr liability
3. Borrowing costs - Loan taken to construct an asset over time