Notes
IAS 16 - PPE
Content of the notes (1)
Page 1
PPE Initial recognition :
R - RESOURCE - When it’s probable that we will get future economic benefits
C - CONTROL - When we control the asset
C - COST - When the asset’s cost can be measured reliably
COST OF THE ASSET :
1. site preparation, delivery and handling, installation, related professional fees for architects and engineers
2. Dismantling costs - PRESENT VALUE
Dr Asset
Cr Liability
Discount the costs and unwind the cost (using discount rate) every year
PV x Discount rate
Dr interest (with unwinding of discount)
Cr liability
3. Borrowing costs - Loan taken to construct an asset over time
Information
- Description
- Accounting Note on IAS 16 - PPE, created by Anusha Shahid on 18/02/2019.
- Created by
- Anusha Shahid
- Views
- 6
- Tags
- Rating
More on Non-Financial Assets and Impairment