Test
Flight Management & GNSS
Crea una cuenta gratis para terminar este test
Guarda tu progreso y consulta tu resultado final.
¿Ya tienes cuenta? Inicia sesión
Preguntas del test (10)
1FMC Calculations are based on:
- AA great circle
- BA rhumb line
2An aircrafts crew observes a higher than normal fuel flow in one tank and concludes that there is a fuel leak. They configure the system so that they are using the fuel from the leaking tank first. How should the crew adjust their altitude and speed?
- AOptimum Range
- BOptimum Endurance
- CLong Range Cruise
- DHighest Groundspeed
3Select correct statement(s) regarding RAIM:
- AFour satellites required
- BFive satellites required
- CFive satellites and it removes the erroneous satellite
- DSix satellites and it removes the erroneous satellite
4The CDI deflections in the APP Phase is?
- A±1nm
- B±10nm
- C±5nm
- D±0.3nm
5How many satellites are needed for RAIM?
- A4 with Barometric aiding
- B4
- C5
6What are the limitations of CDI Deflections in the ENR phase?
- A±0.5nm
- B±10nm
- C±5nm
- D±15nm
7DGPS utilizes:
- AA base station
- Bthe use of RAIM
- C4 satellites
- Da ground station
8The CDI deflections in the TERM phase are?
- A±5nm
- B±0.3nm
- C±1nm
- D±0.1nm
9Approach (APP): ±0.3nm. The CDI deflection reduces progressively to 0.3nm within __nm prior to the Final Approach Fix.
- A2
- B3
- C4
- D1
10Terminal (TERM): ±1nm. This reduces from ±2nm to ±1nm within __nm of your destination. (New TSO 145/146 Regulations)
- A10
- B20
- C50
- D30
Información
- Descripción
- ATPL (Navigation Calculations) Navigation Test sobre Flight Management & GNSS, creado por Andrew Lee el 08/10/2016.
- Autor
- Andrew Lee
- Idioma
- English
- Visitas
- 0
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test
Más sobre GNSS and Performance-Based Navigation