Test
Construction Documents
Este test tiene tipos de pregunta que se abren en el reproductor de siempre.
Preguntas del test (39)
1Egress requirements and number of required exits determined by [blank_start]occupancy use[blank_end] and [blank_start]occupant load[blank_end].
- Aoccupancy use
- Boccupant load
2Code dictates [blank_start]number and location of exits[blank_end], [blank_start]maximum distance between required exits[blank_end], [blank_start]minimum width of exit corridors[blank_end], [blank_start]minimum width of exit doors[blank_end], [blank_start]required width of exit stairways[blank_end], [blank_start]travel distance to exits[blank_end] and [blank_start]length of dead-end corridors[blank_end].
- Anumber and location of exits
- Bmaximum distance between required exits
- Cminimum width of exit corridors
- Dminimum width of exit doors
- Erequired width of exit stairways
- Ftravel distance to exits
- Glength of dead-end corridors
3ADA = [blank_start]American Disabilities Act[blank_end]
- AAmerican Disabilities Act
4Discipline Order: [blank_start]general[blank_end], [blank_start]civil[blank_end], [blank_start]structural[blank_end], [blank_start]architectural[blank_end], [blank_start]plumbing[blank_end], [blank_start]mechanical[blank_end], [blank_start]electrical and communications[blank_end], and [blank_start]fire protection[blank_end].
- Ageneral
- Bcivil
- Cstructural
- Darchitectural
- Eplumbing
- Fmechanical
- Gelectrical and communications
- Hfire protection
5Sheet number by series
A-100: [blank_start]floor plans[blank_end]
A-200: [blank_start]exterior elevations[blank_end]
A-300: [blank_start]building sections[blank_end]- Afloor plans
- Bexterior elevations
- Cbuilding sections
6IBC: [blank_start]International Building Code[blank_end]
- AInternational Building Code
7ICC: [blank_start]International Code Council[blank_end]
- AInternational Code Council
8LSC: [blank_start]Life Safety Code[blank_end]
- ALife Safety Code
9NFPA: [blank_start]National Fire Protection Association[blank_end]
- ANational Fire Protection Association
10Group A - [blank_start]Assembly[blank_end]: theaters, restaurants, places of worship, recreation, amusement, arenas, stadiums
Group B - [blank_start]Business[blank_end]: banks, doctor's offices, clinics
Group E - [blank_start]Educational[blank_end]: day care centers, schools
Group F - [blank_start]Factory[blank_end]
Group H - [blank_start]High Hazard[blank_end]
Group I - [blank_start]Institutional[blank_end]: hospital, nursing home, prison
Group M - [blank_start]Mercantile[blank_end]: grocery, department store
Group R - [blank_start]Residential[blank_end]: houses, apartments, hotels
Group S - [blank_start]Storage[blank_end]: warehouse, parking garage
Group U - [blank_start]Utility and Miscellaneous[blank_end]: water towers, barns- AAssembly
- BBusiness
- CEducational
- DFactory
- EHigh Hazard
- FInstitutional
- GMercantile
- HResidential
- IStorage
- JUtility and Miscellaneous
11Building systems and materials are selected based on [blank_start]type and/or use of building[blank_end], [blank_start]building code requirements[blank_end], [blank_start]design and planning solutions[blank_end], [blank_start]structural concepts[blank_end], [blank_start]economic considerations[blank_end], [blank_start]environmental influences[blank_end] and [blank_start]energy requirements[blank_end].
- Atype and/or use of building
- Bbuilding code requirements
- Cdesign and planning solutions
- Dstructural concepts
- Eeconomic considerations
- Fenvironmental influences
- Genergy requirements
12CSI: [blank_start]Construction Specification Institute[blank_end]
- AConstruction Specification Institute
13MasterFormat is a [blank_start]master list of numbers and titles[blank_end].
- Amaster list of numbers and titles
14In the organizational structure, how many groups are there?
- A1
- B2
- C3
- D4
15In the organizational structure, how many subgroups are there?
- A30
- B40
- C50
- D60
16In the organizational structure, how many divisions are there?
- A25
- B50
- C75
- D100
17Which division is Requirements?
- A00
- B01
- C02
- D03
18Facility Construction is...
- ADiv 02-19
- BDiv 20-29
- CDiv 30-39
- DDiv 40-49
19Facility Services is...
- ADiv 02-19
- BDiv 20-29
- CDiv 30-39
- DDiv 40-49
20Site and Infrastructure is...
- ADiv 02-19
- BDiv 20-29
- CDiv 30-39
- DDiv 40-49
21Process and Equipment is...
- ADiv 02-19
- BDiv 20-29
- CDiv 30-39
- DDiv 40-49
22The four types of specifications: [blank_start]descriptive[blank_end], [blank_start]proprietary[blank_end], [blank_start]performance[blank_end] and [blank_start]reference standard[blank_end].
- Adescriptive
- Bproprietary
- Cperformance
- Dreference standard
23An example of a vicinity map would be [blank_start]the city of Tuskegee[blank_end].
An example of a location plan would be [blank_start]Tuskegee University[blank_end].
An example of a site plan would be [blank_start]the building site[blank_end].- Athe city of Tuskegee
- BTuskegee University
- Cthe building site
- DTuskegee University
- Ethe city of Tuskegee
- Fthe building site
- Gthe building site
- Hthe city of Tuskegee
- ITuskegee University
24The plat map deals with property lines and boundaries.
- AVerdadero
- BFalso
25The topographic survey shows contours, existing buildings, vegetation and sea level.
- AVerdadero
- BFalso
26Which is an example of a civil plan?
- AUtility plan
- BCirculation plan
- CLandscape plan
- DAll of the above
27Which is an example of a structural plan?
- AFoundation plan
- BFloor framing plan
- CRoof framing plan
- DAll of the above
28Water going in will be shown on the...
- AWaste water plan
- BWater plan
- CBoth
- DNeither
29Water pipes are normally...
- A1/2"
- B3/4"
- CBoth
- DNeither
30Pipes for in-water are generally [blank_start]copper[blank_end].
Pipes for out-water are generally [blank_start]cast iron[blank_end].- Acopper
- Bcast iron
- Ccast iron
- Dcopper
31What shows up on a mechanical plan: [blank_start]HVAC[blank_end], [blank_start]heat pump[blank_end], [blank_start]ductwork[blank_end], [blank_start]boiler[blank_end], [blank_start]furnace[blank_end], [blank_start]supply[blank_end] [blank_start]diffuser[blank_end], [blank_start]chiller[blank_end], [blank_start]air handling unit[blank_end], and [blank_start]air and water cooling[blank_end].
- AHVAC
- Bheat pump
- Cductwork
- Dboiler
- Efurnace
- Fsupply
- Gdiffuser
- Hchiller
- Iair handling unit
- Jair and water cooling
32A ductwork plan shows [blank_start]ducts[blank_end], [blank_start]diffusers[blank_end] and [blank_start]VA boxes[blank_end].
- Aducts
- Bdiffusers
- CVA boxes
33Electrical plans: [blank_start]lighting[blank_end], [blank_start]power[blank_end] and [blank_start]communications[blank_end].
- Alighting
- Bpower
- Ccommunications
34Lighting plans show [blank_start]light switches[blank_end], [blank_start]circuiting[blank_end] and [blank_start]light fixtures[blank_end].
- Alight switches
- Bcircuiting
- Clight fixtures
35Power plans show [blank_start]outlets[blank_end], [blank_start]receptacles[blank_end], [blank_start]transformers[blank_end], [blank_start]electrical panels[blank_end] and [blank_start]circuits[blank_end].
- Aoutlets
- Breceptacles
- Ctransformers
- Delectrical panels
- Ecircuits
36A communications plan includes [blank_start]phones[blank_end], [blank_start]internet[blank_end], [blank_start]data[blank_end], [blank_start]security[blank_end] and [blank_start]public address[blank_end].
- Aphones
- Binternet
- Cdata
- Dsecurity
- Epublic address
37Composite plan: [blank_start]the plan of the entire building[blank_end]
Block plan: [blank_start]separating building plan in block[blank_end]
Enlarged plan: [blank_start]specific area of floor plan[blank_end]
Demolition plan: [blank_start]the area of past and future construction[blank_end]
Key plan: [blank_start]where everything is in relation to the b[blank_end]uilding- Athe plan of the entire building
- Bseparating building plan in block
- Cspecific area of floor plan
- Dthe area of past and future construction
- Ewhere everything to the building
- Fseparating building plan in block
- Gthe plan of the entire building
- Hspecific area of floor plan
- Ithe area of past and future construction
- Jwhere everything is to the building
- Kspecific area of floor plan
- Lthe plan of the entire building
- Mseparating building plan in block
- Nthe area of past and future construction
- Owhere everything is to the building
- Pthe area of past and future construction
- Qthe plan of the entire building
- Rspecific area of floor plan
- Sseparating building plan in block
- Twhere everything is to the building
- Uwhere everything is to the building
- Vthe plan of the entire building
- Wspecific area of floor plan
- Xthe area of past and future construction
- Yseparating building plan in block
38Two ways of presenting schedules: [blank_start]tabulated[blank_end] and [blank_start]pictorial[blank_end].
- Atabulated
- Bpictorial
39Schedules most frequently used in architectural drawings: [blank_start]door[blank_end], [blank_start]window[blank_end], [blank_start]room finish[blank_end] and [blank_start]equipment/furniture[blank_end].
- Adoor
- Bwindow
- Croom finish
- Dequipment/furniture
Información
- Descripción
- Study quiz for final
- Autor
- Micah Blevins
- Idioma
- English
- Visitas
- 47
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test