  1. 1You are about to release a test progress report to a senior manager, who is not a test specialist. Which of the followin topics should NOT be included in the test progress report?
    1. AProduct risks which have been mitigated and those which are outstanding
    2. BRecommendations for taking controlling actions
    3. CStatus compared against the started exit criteria
    4. DDetailed overview of the risk-based test approach being used to ensure the exit criteria to be achieved
  2. 2Explain how the above mentioned report may differ from a report that you produve for the project manager, who is a test specialist. Select TWO items from the following options that can be used to report to the project manager and woild not be included in a report to senior management.
    1. AShow details on effort spent
    2. BList of all outstanding defects with their priority and severity
    3. CGive product risk status
    4. DShow trend analysis
    5. EState recommendations for release
  3. 3Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in archieving one of those objectives?
    1. AAverage number of days between defect discovery and resolution
    2. BPercentage of requirements covered
    3. CLines of code written per developer per day
    4. DPercentage of test efforts spent on regression testing
  4. 4You have been given responsibility for the non-functional testing of a safety-critical monitoring and diagnostics package in the medical area. Which of the following would you least expect to see addressed in the test plan?
    1. AAvailability
    2. BSafety
    3. CPortability
    4. DReliability
  5. 5Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains!
    1. AHigh level of documentation
    2. BFailure Mode and Effect Analysis (FEMA) sessions
    3. CTraceability of requirements
    4. DNon-functional testing
    5. EMaster test planning
    6. FTest design techniques
    7. GReviews
  6. 6A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary. Which of the following is NOT an influencing factor for the level of detail of the test logs being produced?
    1. ALevel of test execution automation
    2. BTest level
    3. CRegulatory requirements
    4. DExperience level of testers
  7. 7Considerable attention will be given in this project to defining exit criteria and on reporting back on their status. Which combination of TWO exit criteria from the list woild be best to use?
    I. Total number of defects found
    II. Percentage of test cases executed
    III. Total test effort planned versus total actual test effort spent
    IV. Defect trend (number of defects found per test run over time)
    1. A(i) and (ii)
    2. B(i) and (iv)
    3. C(ii) and (iii)
    4. D(ii) and (iv)
  8. 8Section 2
    Details: Topic 2, Scenario 2 "Reviews"
    A software development organization wants to introduce some specific improvements to its test process. Currently, most of their testing resources are focused on system testing. They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.

    Identify the THREE types of formal peer reviews that can be recognized.
    1. AInspection
    2. BManagement review
    3. CWalkthrough
    4. DAudit
    5. ETechnical review
    6. FInformal review
    7. GAssessment
  9. 9As part of the improvement program, the organization is also looking at tool support.
    Which type of tool could be used to ensure higher quality of the code to be reviewed?
    1. AReview tool
    2. BTest execution tool
    3. CStatic analysis tool
    4. DTest design tool
  10. 10What is the main reason why reviews are especially beneficial in the above-mentioned scenario?
    1. AThey ensure a common understanding of the product
    2. BThey find defects early
    3. CThey enhance project communication
    4. DThey can be performed without exercising the code

Información

Descripción
Testing Test sobre Advanced TM, creado por szando el 12/04/2015.
Autor
szando
Idioma
English
Visitas
6
Etiquetas
testing
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?