Chapter 3 Cabling, Pathway & Spaces Part 1

eric rinehart 37 preguntas

Hacer el test

Preguntas del test (37)

  1. 1A Consolidation Point (CP) should serve up to 24 work areas?
    1. AVerdadero
    2. BFalso
  2. 2How many walls of a TR should have fire-retardant plywood?
    1. A2
    2. B1
    3. C3
    4. D4
  3. 3Cross-Connect Field Colors: Second-Level Backbone
    1. AGray
    2. BOrange
    3. CWhite
    4. DBrown
  4. 4This type of backbone cabling distributes telecommunications services between telecommunications spaces within a single building
    1. AIntrabuilding
    2. BInterbuilding
    3. CFiber Optic
  5. 5What is the maximum length of FMT
    1. A20 feet
    2. B10 feet
    3. C15 feet
    4. D25 feet
  6. 626 AWG has ______ more attenuation
    1. A50%
    2. B20%
    3. C30%
    4. D40%
  7. 7Cross-Connect Field Colors: Network Connections
    1. AGreen
    2. BBlue
    3. CPurple
    4. DYellow
  8. 8This type of backbone consists of cabling that is installed between a MC and IC/HC
    1. AFirst Level
    2. BSecond Level
    3. CInterbuilding
    4. DFiber Optic
  9. 9Cross-Connect Field Colors: First Level Backbone
    1. AWhite
    2. BGray
    3. CBrown
    4. DBlue
  10. 10It is acceptable to use a TE in place of a TR
    1. AVerdadero
    2. BFalso

Información

Descripción
Technician
Idioma
English
Visitas
134
Etiquetas
technicianinstallertelecommunicationsinstaller courses review questionschapter 3 cabling, pathway & spaces
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Más sobre Structured Cabling and Installation

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?