  1. 1What is adaptation testing?Acceptance testing: when the client tests the bespoke software (software designed specifically for him) to see if his specs and requirements have been met
  2. 2What is beta testing?Following alpha testing, software will be distributed to a sample of people that's representative of the client sector. The people in this sample test and report any faults or comments to the developing company
  3. 3What is integration testingTesting that all individual working components will also worked when joined together. This is done incrementally: a component is added, tested and modified before another is added and goes through the same process.
  4. 4Formula to calculate expected time in PERT charts?Formula for expected time is
    E = (O + 4M + P)/6
    where O is the optimistic time, M is the most likely time, and P is the pessimistic time.
  5. 5What is alpha testing?In house testing of the the final completed software before it's released.
  6. 6What are latest start (LS) and latest finish (LF) times?LF is the latest completion time (e.g. week no. 4) of a task without delaying the project
    LS is the latest time a task is expected to start, which is = LF - task duration.
  7. 7What is a critical path?Longest path through the PERT chart. This represents the minimum required time to complete a project.
  8. 8What is acceptance testing?When the bespoke software is tested by its intended client and a feedback is given if the requirements are not met, else the client will sign off the software.
  9. 9Why do errors occur?- Inaccurate specification of the software
    - coding mistakes
    - software designer makes a mistake
    - poor user interface design leading to user usage mistake
    - failure to write to accommodate the hardware or hardware fails
  10. 10What is slack time?The difference between LS and ES: this shows the number of spare weeks that the team has before a task needs to start
  11. 11What is the equation that identifies the nodes on a critical path?ES=LS [I.E. no slack time]
  12. 12How is a task's LF calculated, using backwards passes, when more than 1 subsequent tasks all depend on said task?The previous task would have an LF equal to the following dependent task with the lowest LS.

Información

Descripción
Advanced Level (A- Level) (A2 Practical - Software Dev.) Computer Science Fichas sobre A2 Practical: Software Dev., creado por TS P el 13/04/2017.
Creado por
TS P
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?