  1. 1What does S.M.A.R.T stand for?Specific
    Measurable
    Achievable
    Realistic
    Time
  2. 2What does specific mean?Follow the 6 w's: who, what, when ,where ,why and which. Make sure every part of it is accurate.
  3. 3What does measurable mean?make sure the limits you have set can be achieved and properly measured.
  4. 4What does achievable mean?Being able to complete a certain goal that is able to achieve. and by completing it in a certain time bound.
  5. 5What is meant by realistic?Being able to complete your goal by making sure it can actually be completed. and not a goal that will be unrealistic for example being able to walk on the sun or breathe in space. it has to be achievable!
  6. 6What are the phases in the Project life cycle?Initiation
    Planning
    Execution
    final evaluation
  7. 7What is the Initiation phase?Starting up the project and to
    explain why you have done it.
  8. 8What does the planning phase do?It allows you to briefly work out what you need to get done within the project/time.
  9. 9What is the Execution phase?The deliverables are built and presented to the customer.
  10. 10What is the Evaluation phase?Giving the customer all the completed deliverables and determining whether the project was successful, if not, how to make it better next time.
  11. 11Why do we use Project life cycle?To ensure that we complete the task with the most detail added, and to ensure you to get greater grades, if you don't use this then your grades could be lower than by using Project life cycle.
  12. 12What does a flow chart do?Flowcharts are used in many industries including entertainment, engineering and computer programming. The purpose of all flowcharts is to communicate how a process works or should work without any technical problems.
  13. 13Identify the phase of the project life cycle in which user documentation is created.The phase of project life cycle that uses documentation is called the execution phase.
  14. 14What is a Terminator?(I.T term)An oval flow chart shape indicating the start or end of the process.
  15. 15What is a process?A rectangular flow chart shape indicating a normal process flow step.
  16. 16What is the decision? (I.T term)A diamond flow chart shape indication a branch in the process flow.
  17. 17What is the connector?Is a small, labeled, circular flow chart shape used to indicate a jump in the process flow.
  18. 18What is a data?A parallelogram that indicates data input or output for a process.
  19. 19What is a document?Used to indicate a document or report.
  20. 20What would be the last phase in the project life cycle?The evaluation phase.
    (final evaluation)
  21. 21Would you need a risk plan for your website?yes, to identify risks and plan actions needed to minimize the threat if you have been attacked.
  22. 22What else can T stand for in S.M.A.R.T. ?T can also stand for Tangible –When a goal is tangible you can experience it with one of the senses, that is, taste, touch, smell, sight or hearing.
  23. 23When was S.M.A.R.T first used/invented? And who invented it?SMART was invented by George Doran in the USA for a company he was assisting, and was published in 1981
  24. 24Give an example of how you would use project life cycle.For a bank company, a computer company, car company, Clothes company, etc.

Information

Description
Flashcards on Flash card revision, created by Becks Jagelman on 30/11/2017.
Created by
Becks Jagelman
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?