GoConqr has a new look! Let us know what you think.

Flashcards

CDS - The CONTRACTOR

C Stone CDS- Construction Documents and Services Study Notes English 8 cards

Cards in this deck (8)

  1. 1A201-2007 3.1.1 Referred to in the Contract Documents as singular in nature, in what state is the contractor to be licensed?If required, the contractor to be licensed in
    the jurisdiction where the Project is located.
  2. 2A201-2007 3.1.1 The Contractor is referred to in the Contract Documents as singular in nature, what also does the term “Contractor” means ?The Contractor or the Contractor’s
    authorized representative who shall have express authority to bind the Contractor
    with respect to all matters under this Contract.
  3. 3A201-2007 3.1.2 The Contractor shall perform the Work in accordance with _______________.The Contract Documents.
  4. 4A201-2007 3.1.3 What shall not relieve the Contractor of obligations to perform the Work in accordance with the Contract Documents?1- Activities or duties of the Architect
    in the Architect’s administration of the Contract,
    2- Tests, inspections or approvals required or performed by persons or entities other than the Contractor.
  5. 5A201-2007 3.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has done what prior to signing the contract? Name 3.1- Visited the site.
    2- Become generally familiar with local conditions under which the Work is to be performed
    3- Establish a connection between their personal observations with requirements of the Contract Documents.
  6. 6A201-2007 3.2.2 What is the Contractor required to do before starting each portion of the Work? Name 4.1- Carefully study and compare the
    various Contract Documents relative to that portion of the Work.
    2- Carefully study the information furnished by the Owner (Site/Property Information, See Article 2.2.3).
    3- Shall take field measurement of any existing conditions related to that portion of the Work.
    4- Shall observe any conditions at the site
    affecting it.
  7. 7A201-2007 3.2.2 What IS and IS NOT the purpose of the obligations for the Contractor to review Contract Documents and Field Conditions?PURPOSE: To facilitate coordination and construction by the Contractor.
    NOT THE PURPOSE: To discover
    errors, omissions, or inconsistencies in the Contract Documents
  8. 8A201-2007 3.2.2

Information

Description
CDS- Construction Documents and Services Study Notes Flashcards on CDS - The CONTRACTOR, created by C Stone on 09/01/2018.
Created by
C Stone
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?