Flashcards
BMGT385 - Ch 10

Cards in this deck (36)
- 1when talking about qualityboth mean & variability matter
- 2statistical process control (SPC)-process variability is inevitable (a process can never produce the same quality always)
-use periodic inspection to check whether process is in control
-management needs to separate natural causes of variation (acceptable & normal) from special causes (ex: machine operator had problems at home & performed worse) - 3how much variability is too much?-determine amount of natural variability inherent in system
-determine upper & lower control limits to track process to make sure w/in bounds - 4target valuewhat you're shooting for (ex: length of 10 ft for a table)
- 5tolerance limitsdesign acceptance (ex: length of table can be 10 + or - 1/10 ft)
- 6cause and effect diagramused to identify & illustrate the main causes of the problem

- 7check sheetsused to measure the occurrence of each of the various causes summarized in the cause and effect diagram

- 8pareto chartused to highlight the most important causes

- 9control charts-track process parameter over time (mean = variable quality characteristic, % defects = attribute)
-distinguish between common (in control) & assignable (out of control) causes of variation
-measure process performance (how much common cause is in the process while it's in control)
-control process performance (is process in control) - 10common causes of variability (natural or chance variation)-background noise
-outcome of small unavoidable causes
-"stable system of chance causes" - 11assignable causes (special variation)-not part of the chance causes
-identifiable & preventable (hopefully) - 12variable quality characteristic control chart-measures a variable on a continuous scale, like inches, mins, etc.
-lots of applications in manufacturing
-examples of service applications: time-to-service (cable customer service), customer service time, X bar & R chart - 13attribute data control charts-measures the presence or absence of some key quality characteristic
-success or failure
-p-charts
-examples: on-time or not, defective order or not - 14X bar chartplots mean of individual samples

- 15R chartplots range of individual samples (use w X bar chart to fully interpret process data)

- 16constructing X bar & R charts

- 17constructing a p chart1. compute % of defects for each sample & then overall % (p bar) of defects across all samples
2. estimate sample SD & compute control limits
- 18what x bar, r, & p charts (control) tell1. whether the process is in-control (only natural or common or chance variation is present)
2. whether the process is out-of-control (there are assignable causes of variation in addition)
*aka how consistent the process is (a consistent process doesn't automatically mean high quality...must compare to design specifications)
*tolerance limit is different than control limit - 19what x bar, r, & p charts (control) do NOT tell1. what is the assignable cause?
2. is the process meeting the specifications? - 20—normal (possibly caused by random variation)

- 21—lack of stability (possibly caused by assignable causes, like tool, material, operator, overcontrol)

- 22—cumulative trend (possibly caused by tool wear)

- 23—cyclical (possibly caused by different work shifts, voltage fluctuations, seasonal effects)

- 24what happens when we 1st set up the x bar chart & find that 1+ points fall outside the control limits?see if it's an assignable cause or not & bring process into control 1st
- 25interpreting an X bar & R chart-look at the R chart 1st & if it's out of control, then the control limits on the X bar chart are meaningless
-determine if there are any patterns or trends in the plotted points & if so, then special causes must be eliminated - 26commonly accepted guidelines that indicate a process that has gone out of control1. any observation about the UCL or below the LCL
2. 5 points in a row above or below the center line
3. 5 points in a row all increasing or decreasing (indicate the process is not behaving randomly)
4. any other obviously non-random pattern (hugging the control limits, cyclical patterns, etc.) - 27do we have to redraw the chart every time the process changes?yes
- 28do we plot the individual observations of the sample means? what about the range?only plot sample means & sample ranges (some individual points can lie outside the control limits & still the sample mean can be w/in the limits. that's why we use the range.)
- 29are there applications in service industries?customer complaints, mistakes in invoices or statements (but machine dependent processes are more susceptible to control)
- 30qualityability of a product/service to consistently meet or exceed customer expectations
- 31six sigma

- 32X Sigma (it's hard to reach 6 sigma, so companies will target 4 sigma now)

- 33common vs assignable causes of variation

- 34comparing processes: process capability

- 35process capability measure: Cpmeasures the ability of the process to meet engineering specifications
*if Cp > or = 1, process meets specs 99.7% of the time (at least 3 sigma)
*if Cp > or = 1.33, process is capable - 36don't confuse control limits w specification limits...a process can be in control, yet be incapable
Information
- Description
- Flashcards on BMGT385 - Ch 10, created by Lauren Roche on 04/12/2018.
- Created by
- Lauren Roche
- Views
- 6
- Rating