Flashcards
5.0 Project Scope Management

Cards in this deck (7)
- 1Plan Scope Management

- 2Collect Requirments

- 35.0 Project Scope ManagementProcesses required to ensure the project includes all the work required to complete the project successfully
- 4Product ScopeFeatures and functions that characterize a product, service or results
- 5Project Scopethe work performed to deliver a product service or result with specific features and functions
- 6Scope BaselineApproved version of Scope
- 7Baseline changesOnly via formal change control procedures
Information
- Description
- Flashcards on 5.0 Project Scope Management, created by binky on 17/04/2015.
- Created by
- binky
- Views
- 1
- Rating