GoConqr has a new look! Let us know what you think.

Flashcards

STLC - flash cards

Mircea Manu QA- Fundamentals QA Engineer English 31 cards

Cards in this deck (31)

  1. 1STLCSOFTWARE TESTING LIFE CYCLE
  2. 2STLC STEP 1Analyzing the Requirement
  3. 3STLC STEP 2Test plan
  4. 4STLC STEP 3Writing Test Cases
  5. 5STLC STEP 4Set up test environment (dev)
  6. 6STLC STEP 5Test Case Execution (actual testing)
  7. 7STLC STEP 6RTM - Requirement Traceability Matrix
  8. 8STLC STEP 7Defect Management
  9. 9STLC STEP 8RCA
    Root Cause Analysis
  10. 10STLC STEP 9Test Analysis Report
  11. 11STLC STEP 10Sign-off
  12. 12Analyzing the Requirement⦁ Testers should understand the functionalities that are getting tested
    ⦁ Testers should leverage Agile Ceremonies to ask questions: Backlog Refinement, Sprint Planning
    ⦁ Testers should ask questions to PO, BA, PM, DEV
  13. 13Test PlanIntro
    Scope
    Purpose
    Test Env
    Test Data
    Types of Testing
    Entry Criteria
    Exit Criteria
    Risks
    Reponsibilities
    Glossary
  14. 14Test Analysis Report⦁ Report of all executed test cases are collected from the team by the QA Manager
    ⦁ Report will show how many defects per requirements were identified this release
  15. 15Writing Test CasesStep by step approach on how to test the functionality of the software
  16. 16Set up test environmentYour environment has to be fully ready TO START ACTUAL TESTING (servers up, database refreshed with needed test data, latest code drop happened)
  17. 17Test Case Execution (actual testing)You can start test execution only after you have received a code that you can actually test and environment is ready to test. Without code drop you can't test the latest functionality.
  18. 18RTMRequirement Traceability Matrix
    Document that maps and traces user requirement with test cases
  19. 19Defect Management⦁ We make sure that reported bugs are fixed or deferred
    ⦁ We follow the defect life cycle to properly manage reported defects
    ⦁ We use tools such as JIRA or QA(HP ALM) as defect tracking tools
  20. 20Sign-off⦁ When we completed all of our test cases
    ⦁ When reported defects are fixed and re-tested or deferred
    ⦁ When regression test pased
    ⦁ ALL EXIT CRITERIAS ARE MET
  21. 21Test plan #1 Introincludes project name group name. Who prepared the document & when the last time document got revised
  22. 22Test plan #2 ScopeOur capacity, how many functionalities we will be able to test (QA Scope, the rest is OUT OF QA SCOPE)
  23. 23Test plan #3 PurposeTest the new functionalities for the following items: list the items
  24. 24Test plan #4 Test Environmentwill be the environment details as qa.facebook.com / qa1.amazon.com / qa5.bbc.com
  25. 25Test plan #5 Test DataIs there any pre-set data that needs to be used: login and password
  26. 26Test plan #5 Types of TestingWhat kind of testing should be done
  27. 27Test plan #6 Entry CriteriaDev complete, Unit Passed, Code drop happened
  28. 28Test plan #7 Exit CriteriaDefects are fixed, all test cases passed and release is signed off
  29. 29Test plan #8 Risksin case someone gets sick, family emergency, bugs in prod etc.
  30. 30Test plan #9 Responsibilitieswho is responsible for what and how will this be handled
  31. 31Test plan #10 Glossaryan alphabetical list of terms with explanations

Information

Description
QA Engineer QA- Fundamentals Flashcards on STLC - flash cards, created by Mircea Manu on 03/12/2021.
Created by
Mircea Manu
Views
7
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?