fine blanking

Cards in this deck (61)

  1. 1What constraints dominate at the manufacturing stage?Technological
    market
    physical
  2. 2Methods for reducing component costsRight process.
    Eliminate process steps.
    Choose correct tolerances.
    Standardize components.
  3. 3Forging Requireshigh stresses and often high temperatures
  4. 4Rule of thumb tolerance+/- .001in
  5. 5Cardinal Rules for DFAReduce number of discrete parts as much as possible
    Make the remaining parts as easy to assemble as possible.
  6. 6BD chart Box 1Does this part move relative to all other analyzed parts?
  7. 7BD chart Box 2Is this movement essential for the product to function?
  8. 8BD chart Box 3Must the part be separate to provide the required movement?
  9. 9BD chart Box 4Is this part a different material to ALL Parts already analyzed?
  10. 10BD chart Box 5Is A different material essential for the product to function?
  11. 11BD chart Box 6Must the part be separate to satisfy the different material requirement?
  12. 12BD chart Box 7Is this part separate to allow for service replacement?
  13. 13BD chart Box 8Is replacement essential?
  14. 14BD chart Box 9Must the part be separate to enable replacement?
  15. 15Alpha SymmetrySymmetry about an axis orthogonal to the axis of insertion.
  16. 16Beta SymmeterySymmetry about the axis of insertion
  17. 17The higher the sum of alpha and beta the_______.Fewer feasible orientations the part can have, and the more difficult the assembly is.
  18. 18Thing of symmetery as a different view every ___ degreees-
  19. 192 Fundamental TasksHandling
    Inserting/seruring
  20. 20Relative cost of fastners low to highsnap fits
    plastic bends
    rivets
    threaded fasterners
  21. 21Pyramid AssmeblyAssemble about one axis, preferably from above
  22. 22DFA must be viewed from perspective offirm and assembler
  23. 23design for Location for release-
  24. 24MachiningTypically low volume, high precision, used to finish
  25. 25Metal forming (volume)Largest production process by volume
  26. 26Categories of FabricationSubtractive, additive, joining, forming, finishing
  27. 27Dies MoldsDies-metals
    molds-nonmetals
  28. 28Casting processes requireHeat
  29. 29Cold forging and sheet forming requiresPressure
  30. 30Injection molding, hot forging and die casting requireheat and pressure
  31. 31billet forming includesforging and cold forming
  32. 32Characteristics of forged partshigh strength
    simple shapes,
    low tolerances
  33. 33Progressive dies are best forhigh volume sheet metal forming of complex parts
  34. 34If hole size is critical, process is calledpiercing
  35. 35—fine blankingfine blanking
  36. 36Fine blanking differs from blanking in thatthe blank is not fractured as its removed
  37. 37Fine blanking descriptionSheet is trapped between two punches, and slowly cut from the sheet
  38. 38—deep drawingdeep drawing
  39. 39Forming effect on strengthForming inherently strengthens metals because of the disruption of the crystal lattice
  40. 40What forming processes are used for high strength?Billet and sheet froming
  41. 41When very high strength is needed parts areforged or cold formed
  42. 42sheet forming often results innet shape parts
  43. 43Plasticspolymers plus additives
  44. 44Consumer ThermoplasticsPET, HDPE, PVC, LDPE, PP, PS
  45. 45Weld lines are caused bymetal flowing together as it cools
  46. 46which is better arrangement for thin and thickthick to thin
  47. 47Billet forming has worst ____ and ____.tolerances and surface finishes
  48. 48If you need strength and complexitydie casting
  49. 49Mudawaste
  50. 50The worst wasteOverproductoin
  51. 51WastesOverproduction,
    transportation, inventory, waiting, processing, rework, motion, intellect
  52. 52KaizenContinuous improvement
  53. 53Five S'sSorting, sifting, strict, spic and span, sweeping
  54. 54Elements of lean productionquality assurance, awarness, level production, JIT
  55. 55takt timetotal available production time/total production requirements
  56. 56heijunkalevel production
  57. 57hanseiself reflection
  58. 58AndonSignboard
  59. 59KanbanCard
  60. 60Murauneveness
  61. 61Jidokaautomation

Information

Description
Flashcards on Product Design Exam 3, created by ron on 29/11/2013.
Created by
ron
Views
20
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?