  1. FINAL INSPECTOR (FI)

  2. SHIFT LEADERSHIP (SL)

  3. FI MUST INFORM HER/HIS SUPERVISOR IN THE FOLLOWING CASES

  4. REWORK

  5. SERIAL FAILURE

  6. QS_HU TECHNICIAN

  7. SL MAKE AN IMMEDIATE DECISION BASED ON THE VALID WORK INSTUCTION/DRAWING OR OFFICIAL INFORMATION

  8. QS_HU IS NOT AVAILABLE

  9. SL MOVES THE BATCH TO THE BLOCKING ZONE

  10. QS_HU BLOCKS THE PARTS IN THE SAP SYSTEM UNTIL GOT THE ANSWER

  11. QS_MANAGER

  12. GERMAN IQM TEAM

  13. QS_HU UNBLOCK THE PARTS IN SAP SYSTEM AFTER THE ANSWER FROM IQM

  14. MAKE AN IMMEDIATE DECISION BASED ON THE VALID WORK INSTUCTION/DRAWING OR OFFICIAL INFORMATION