GoConqr has a new look! Let us know what you think.

Flowchart

Untitled

Salma Abigail Bautista Ortiz English

Flowchart content

  1. INTRODUCTION TO MODELING AND SIMULATION

  2. HOW IS SIMULATION USED?

  3. simulation model

  4. Is a descriptive model of a process or system, and includes parameters that allow the model to be configurable,(represent a number of somewhat different system or process configurations).

  5. As a descriptive model, can use to

  6. compare

  7. Experiment

  8. Evaluate

  9. any number of system alternatives

  10. WHEN SHOULD SIMULATION BE USED

  11. Simulation is most useful when:

  12. There is no simple analytic model that is accurate to analyze the situation.

  13. The real system is regularized

  14. The real system has some level of complexity, interaction or interdependence between various components

  15. Are designing a new system, considering major changes in physical layout or operating rules in an existing system

  16. Are considering a large investment in a new or existing system, and it represents a system modification

  17. Need a tool where all the people involved can agree on a set of assumptions

  18. Simulation with animation is an excellent training and educational device, for

  19. ADVANTAGES

  20. Allows the identification of problems

  21. managers

  22. supervisors

  23. engineers

  24. Allows comparison of many alternative designs and rules of operation.

  25. Allows study of the dynamics of a system

  26. A simulation model provides about the only method to study new, non-existent complex dynamic systems for which analytic or static provide at best a low fidelity model with correspondingly low accuracy.

  27. VALUE OF SIMULATION

  28. DISADVANTAGES

  29. Is too costly

  30. In some situations may mislead decision makers into premature conclusions based on insufficient evidence.

  31. are time-consuming, data is not available or costly to obtain

  32. SIMULATION TEAM

  33. almost always conducted by a team that include

  34. The customer’s executives and managers( the decision-makers)

  35. The customer’s engineers, (will live with implemented solutions)

  36. In-house or outside systems designers,( designing a new system or changes)

  37. The simulation analyst.

  38. The Simulation Analyst

  39. practice and- Good communication skills

  40. Models should be developed in a suitable, commercially available and supported simulation package.

  41. STEPS IN A SOUND SIMULATION STUDY

  42. Project Initiation

  43. Problem Formulation and Setting of Objectives

  44. Overall Project Plan

  45. Conceptual Model and Assumptions Document

  46. Project Work

  47. Model Development

  48. Data Collection, Cleansing and Analysis

  49. Model Verification and Validation

  50. Model Verification

  51. Model Validation

  52. Experimentation, Analysis and Reporting

  53. Experimental Design

  54. Experimentation

  55. Analysis

  56. Reporting

  57. MANAGING A SIMULATION PROJECT

  58. should follow these guidelines and watch for a number of potential pitfalls

  59. Have clearly defined and achievable goals.

  60. Allocate adequate resources.

  61. Get upper management support and buy-in.

  62. Have periodic review meetings with all key people present.

  63. Don’t be afraid to ask obvious or “stupid” questions.

  64. Assume nothing. Confirm everything.

  65. Documents assumptions and all changes to assumptions.

  66. Potential pitfalls and causes of project failure

  67. Scope creep

  68. Time slippage/project overrun

  69. Too much detail

  70. Wrong skill sets

  71. DEFINITIONS AND CONCEPTS

  72. simulation model

  73. Is a representation that incorporates time and the changes that occur over time.

  74. discrete model

  75. is one whose state changes only at discrete points in time, not continuously.

  76. discrete-event model

  77. is one whose state changes only at discrete times called event times.

  78. An event

  79. is an instantaneous occurrence that changes the model’s state.

  80. An activity

  81. is a duration of time

  82. the science portion, programming, modeling, and a working knowledge of probability and statistics

Information

Description
Flowchart on Untitled, created by Salma Abigail Bautista Ortiz on 13/05/2021.
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?