GoConqr has a new look! Let us know what you think.

Mind map

SAB2#34 Detalles de PMIS

Gerardo Rodríguez Spanish

SAB2#34 Detalles de PMIS

Map content

SAB2#34 Detalles de PMIS

  1. Configuration Management System

    • A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to: identify and document the functional and physical characteristics of a product, result, service, or component; control any changes to such characteristics; record and report each change and its implementation status; and support the audit of the products, results, or components to verify conformance to requirements. It includes the documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes.
    • collection of formal documented procedures used to apply technical and administrative direction and surveillance to:
      • identify and document the
        • functional and physical characteristics of a product,
        • result,
        • service,
        • or component;
      • control any changes to such characteristics;
  2. Work Authorization System

    • A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and in the proper sequence. It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations.
    • It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that
      • the work is done by the identified organization,
      • at the right time,
      • and in the proper sequence.
  3. Change Control System

    • A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled.
    • A set of procedures that describes how are managed and controlled.
      • modifications to the project deliverables
      • and documentation
  4. Project Management Information System

    • An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems.
    • An information system consisting of the tools and techniques used to
      • gather,
      • integrate,
      • and disseminate
        • the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems.

Images and files in the map

  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS

Information

Description
Mind Map on SAB2#34 Detalles de PMIS, created by Gerardo Rodríguez on 02/08/2014.
Views
25
Rating

More on Organizational Influences on Projects

Feedback

What is it about?

What do you think of the new look?

How do you like it?