constructive process of a dwelling
step one
- site preparation
- ·a backhoe and an excavator are used to clean the site
- ·the site is leveled and wooden forms are placed to serve as a template for the foundation and dig holes and trenches.
- ·Footings are installed
- ·Once the concrete is poured into the holes and ditches, it will take time to heal.
- . Once the concrete is cured, it is installed drains, sewers, water taps and any plumbing that must enter the first floor slab
- ·Once the concrete is poured into the holes and ditches, it will take time to heal.
- ·Footings are installed
- ·the site is leveled and wooden forms are placed to serve as a template for the foundation and dig holes and trenches.
- ·a backhoe and an excavator are used to clean the site
- site preparation
step two
- complete the approximate framing of the house
- The floors, walls and roof systems are completed. The cladding is applied to the exterior walls and roof. doors and windows are installed, The coating is covered with a protective barrier
- complete the approximate framing of the house
step three
- Complete the plumbing, electricity
- Once the frame is finished, the coatings and ceilings can be installed
- Sewer and ventilation lines are installed, as well as water supply lines for each accessory
- HVAC ventilation pipes are installed through the roof
- Then, an electrician installs receptacles for electrical outlets, lights and switches,
- Keep in mind that HVAC ducts and plumbing are usually installed before wiring
- Then, an electrician installs receptacles for electrical outlets, lights and switches,
- HVAC ventilation pipes are installed through the roof
- Sewer and ventilation lines are installed, as well as water supply lines for each accessory
- Once the frame is finished, the coatings and ceilings can be installed
- Complete the plumbing, electricity
Step four
- install insulation a more confortable consistent indoo climate, are insulated in all exterior walls,attic,and any floors that are located above
step five
- Complete with drywall and interior textures
- complete dryall start exterior finished start exterior finished drywall is hung and taped and drywall texturing is completed the primer coat of paint is also applied
- Complete with drywall and interior textures
step six
- Complete the interior trim
- install exterior driveways and walkways interior doors base boards, door casings, window sills, walk ways and patios are formed at this stage
- Complete the interior trim
step seven
- Ceramic tiles, vinyl and wooden floors are installed
step eight
- installation of bathroom accessories luminaires, electrical outlets and switches and the electrical panel is completed. Washbasins, toilets and faucets are placed.
step nine
- installation mirrors, shower doors and carpets. Trees, shrubs and grass are planted and other exterior gardens are completed.
step ten
- the builder will guide you through your new home to familiarize you with its features and the operation of various systems and components