Article on project methodology

  1. Stage 1- Desire

    • Must start at the end = description of the future of the project
    • The past must be studied
    • Study models that are similar and that are successful
    • Study the most successful points of models or programs
    • Start dreaming about the program
    • Dreans = the best engine in the universe
    • Study of existing legislation in relation to the product to be produced
    • - Obstacles
      • Limitations, obstacles and disabilities
      • Limitations, obstacles and disabilities
      • Solution of the body: Hydrocortisone
      • Knowing the images but not knowing how to project them
      • - Essential: Keep track of our images and our process
  2. Stage 2 - Current Actions

    • The type of product to be created or improved is studied and determined.
    • It focuses on the actions that will be taken in the present and in the future.
    • The type of human organization of the project is studied.
    • The changes made are compared with the past of the project or model to be changed.
    • We collect important information in the three pillars of society: I, others and context.
    • You learn to pick up other people’s opinions and compare them with our perception.
    • At the end of the stage you must redefine desired images of the first stage.
  3. Step 3 - Evaluation (Comparison)

    • The images of stage 1 are compared with the current images of stage 2.
    • It should focus on two aspects:
      • The first of these are the differences between those we want and have.
      • The second is the effectiveness of current actions on what we want in the future.
    • Without evaluation it is not possible to know the progress that has been made in the designated time
      • _ The evaluation provides us with sufficient information to be able to take the necessary measures for the improvement of the product.
  4. Stage 4 - Planning of actions and forms of follow-up

    • Step 4 consists of actions to improve the product or the project itself.
    • This planning takes place in two different parts:
      • The first is the approach or design of the actions to be taken in order to reach from the current point to the desired point.
        • The essential ingredients for compliance with this part are:
          • - Actions must be triggered immediately or in a short period of time.
          • - These actions must be concise, detailed and clear.
          • - The plan contains proactive and positive actions that can lead the project to the desired image.
          • - The actions you wish to implement are achievable and in accordance with the regulations.
          • - The actions are the result of a commitment by the parties involved.
          • - These actions are feasible and do not present any risk.
          • - These actions achieve a type of persistence to reach the original image.
      • The second consists of the design of follow-up forms for such actions.
        • The essential ingredients for compliance with this part are:
          • - One of the ingredients of this stage are the indicators of progress for the set of actions planned.
          • - The following is the collection and revision of data and information on progress and indicators.
          • - The third is the time taken to collect data
          • - The last is the recording and documentation of the data and analyses collected.

Information

Description
Mind Map on Article on project methodology, created by Mateo García on 03/05/2020.