Mind map
Sabpms#40_Create_WBS

Map content
Sabpms#40_Create_WBS
- Process Group: Planning Knowledge Are: Scope Management
Shows all the scope on the project, broken down into manageable deliverables
WBS is an effort to decompose the deliverables into smaller pices called work packages
Refers to the work products or deliverables that result from an activity o group of activities
Rules for creating WBS
- Created with the help of the team
- Each level of WBS is a smaller piece of the previous level
- The entire project is included
- Includes only deliverables that are required for the project
- Deliverables not in the WBS are not part of the project
OPAs - Organizational process assets
Requirements documentation
Project scope statement
EEFs
Scope management plan
Work Breakdown Structure
WBS Dictionary
- Contains details for every work package
Decomposition
Images and files in the map
Information
- Description
- Mind Map on Sabpms#40_Create_WBS, created by Juan Salazar on 22/10/2016.
- Created by
- Juan Salazar
- Views
- 5
- Rating
More on Work Breakdown Structure