  1. DEFINITIONS

    • CIDB 2000
      • The place and placed provided or made available by the Employer where the Works are to be executed or carried out and any other places as may be designated in the Contract as forming part of the Site.
    • PAM 2006
      • The land and other places on, in, under, over or through which the Works are to be executed and is provided by the Employer for the purposes of the Contract including other land and places obtained by the Contractor and accepted by the Employer as forming part of the Site.
    • PWD 203A
      • The land and other places on, above, under, in or through which the Works are to be executed and any other lands or places provided or approved by the Government for working space or any other purposes as may be specifically designated in this Contract and whether the same may be on the Site or not.
    • LOCATIONS
      • 1. Articles of Agreement
        • 2. Condition of Contract
          • 3. Appendix to the Condition of Contract
            • 4. Preliminaries
              • 5. Contract Specifications
                • 6. Contract Drawings
  2. SITE POSSESSION

    • DEFINITION
      • The land and other places on, above, under, in or through which the Works are to be executed and any other lands or places provided or approved by the Government for working space or any other purposes as may be specifically designated in this Contract and whether the same may be on the Site or not.
    • the contractos must be given possession of the whole site and that in giving possession on a peacemeal basis, the employer is in breach of contract thereby entitling the contractors to damages
    • fail to give possession before or the date stated within the contract, is a breach of contract –reason [site contractors cannot execute the Works under the contract. not only of the express terms of a contract but also a breach of a term that would be implied at common law in the absence of such an express term
    • the contractor has an implied of right of access to the site in so far as access is controlled by the employer, otherwise it will be impossible for him to carry out the works
    • It can be postponed unless the contract expressly permits, the employer cannot postponed or deer the giving of effective site possession.

Images and files in the map

  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)
  • S I T E (1st Board)

Information

Description
Mind Map on S I T E (1st Board), created by Patrick Stitch on 20/09/2017.
Created by
Patrick Stitch
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?