Mind map
OPERATIONAL RISK
Map content
OPERATIONAL RISK
PROCUREMENT
- BUDGET EXCEEDS
- INCORRECT INFORMATION FROM THE INVESTOR
- LACK OF SUCCESSION PLANNING
- SCHEDULE OVERRUNS
- OVER-OPTIMISTIC WORKLOAD
- ACCEPTANCE TOWARDS UNREALISTIC DEADLINE
- REMUNERATION PROBLEM (LATE SALARY)
- UNDOCUMENTED CHANGE ORDER
- DEFECTIVE DESIGN
- INCOMPLETE QUANTITY ESTIMATE
- CONTRACTOR INSOLVENCY
- DIFFICULT TO OBTAIN PERMIT
- CLAIM SETTLEMENT
- INADEQUATE LEAD TIME
- INADEQUATE SUPPLY SOURCE
LOGISTICS (SYSTEM)
- OVERLOADING
- TRAFFIC CONGESTION
- PROJECT DELAY
- ACCIDENT DURING LOADING AND UNLOADING AT SITES
- ROAD ACCIDENT
- MATERIAL DELIVERY DELAY
- PRIME MOVER TYRES EXPLODES
- SCAFFOLDING FALL DOWN
- FORKLIFT BREAKDOWN
- STRUCK BY EQUIPMENT DURING LOADING AND UNLOADING
- CRANE BREAKDOWN/DEFECTIVE
- WEATHER CONDITION (FLOOD, EARTHQUAKE)
- ROAD CONDITION (SLIPPERY, HOLES, DAMAGE)
- LORRY AND TRUCK BREAKDOWN
- ACCIDENT ON WORKERS
HUMAN RESOURCES
- WORKERS NOT ABIDE THE REGULAR WORK HOURS
- WORKERS ARE INJURED IN WORKING HOURS
- CONFLICT AMONG WORKERS IN CONSTRUCTION SITES
- CUSTOMER COMPLAIN
- POOR LEADERSHIP
- CORRUPTION IN WORKERS
- POOR ETHICS AMONG WORKERS
- HIGH ABSENTEEISM AMONG EMPLOYEE
- WORKER'S STRIKE
- SHORTAGE SKILLS
- SHORTAGE LABOR
- FRAUD
- HUMAN ERROR
- WORKERS TURNOVER
- SABOTAGE
RESOURCES
- WEAR AND TEAR MACHINE
- WASTE OF RESOURCES
- MATERIAL SHORTAGE
- EQUIPMENT NOT PROPERLY HANDLE
- MACHINERY NOT AVAILABLE
- LOW OPERATING PRODUCTIVITY
- WRONG MATERIAL ORDER
- SKILL GAPS BETWEEN WORKERS
- INCOMPLETE DESIGN DOCUMENTS
- INTERRUPTING DURING DELIVERY RESOURCES
- UNABLE ADAPT WITH NEW TECHNOLOGY
- NATURAL DISASTER (FLOOD, EARTHQUAKE)
- MATERIAL/LABOUR AVAILABILITY
- DEFECT MATERIAL/EQUIPMENT
- NON-QUALITY MATERIAL
CONSTRUCTION
- POOR AND INADEQUATE LIGHTING
- NATURAL DISASTER FLOOD AND EARTHQUAKE
- FALL FROM HEIGHT
- ABSENTEEISM OF TRAINED MANPOWER AT SITES
- CHANGES IN PROJECT IS POORLY MANAGED
- CUTS FROM SHARP OBJECTS
- INJURY / DEATH AT CONSTRUCTION SITES
- FALLING OBJECTS
- LACK OF COMMUNICATION BETWEEN TOP LEVEL, MIDDLE LEVEL AND BOTTOM
- INEXPERIENCE PERSONNEL ON SITE
- BUILDING ON FIRE
- CONFLICT AMONG DESIGNING TEAM
- UNTRAINED PILING RIG MACHINE
- FALL DOWN STACKING MATERIAL
- POOR QUALITY WORKMANSHIP
- COLLAPSE (NOT SUITABLE)
Information
- Description
- Mind Map on OPERATIONAL RISK, created by aeri baek on 05/11/2017.
- Created by
- aeri baek · Nov 2017
- Updated
- Nov 5, 2017
- Views
- 0
- Rating