SRT 214- 2

  1. Week 6

    • Facilities Services Division
      • Capital Projects
        • New Construction
      • Space Management
      • Asset Maintenance
        • Plumping
        • Electrical
        • Panting
    • Maintenance Types
      • Preventative Maintenance
        • Corrective Maintenance
          • Statutory Maintenance
            • Backlog Maintenance
  2. Week 7

    • Defects
      • Wall cracking
        • Concrete Cancer
          • Rising Damp (Dampness)
            • Asbestos
              • Mould
  3. Week 8

    • Construction Elements
      • Substructure
        • Frame
          • Envelope
            • Services
              • Internal works
                • Facilities
    • Module Construction
    • Prefabricated Construction
      • 2D Prefab
      • 3D Prefab
      • Precast Concrete
    • Building process
      • 1- Planning
        • 2- Proposal
          • 3- Construction
            • 4- Installation
              • 5- Completion
  4. Week 9

    • Building Substructure
    • Soil Types
      • Rock
      • Gravels & Sand
      • Silts & Clays
      • Peat & organic Soils
    • Contaminated Ground- Treatment
      • Removal- Location
        • Layer between contaminated ground
          • Biological- neutralise/remove
    • Foundations- Selection Criteria
      • Ground Conditions
        • Accessibility
          • Proximity- Other structures
            • Timeframes
    • Foundation Types
      • Shallow Forms
        • Pad Foundations
        • Strip Foundations
        • Raft Foundations
      • Deep Forms
        • Pilies
          • Displacement Piles
          • Replacement Piles
          • Selecting Pile Types
            • Location
              • Nature of Ground
                • Cost
                  • Structural performance
                    • Durability
    • Basements
      • Types- Wall Structure
        • Type A- Tanked
          • Type B- Waterproof
            • Type C- Drained
      • Basement Construction
        • 1- Nature of the Site
          • 2- Building Form
            • 3- Legal Issues
              • 4- Economic issues
        • Methods
          • Open Excavations (Shallow)
          • Excavations with temporary support (Deep)
          • Excavations with permanent retaining walls- Prior to Excavation (Deep)
  5. Week 10

Information

Description
2018 TRI 1 Mind Map on SRT 214- 2, created by Nathan Hick on 31/05/2018.
Created by
Nathan Hick
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?