Solar & Storage OMS - 12/19/18
Ground Mounted Solar
- Site Evaluation & Permitting Support
- Due Diligence Review
- POTENTIAL FOR ALL SERVICES: Review of engineering plan sets, technology selection, production potential, environmental reports, permitting documents, or GIS files for industry standards, constructability, value engineering, potential landowner concerns, permitting flags, future operations and maintenance concerns, consistency and accuracy. DELIVERABLE: Red-lined plan sets, memorandums summarizing results and recommendations.
- Conceptual Site Plans
- ELECTRICAL ENGINEERING: Use GIS based mapping, aerial photography, and field assessments to locate and map the solar plant, shading obstacles and major required infrastructure improvements including racking, roads, collection system, transmission lines, substations, and O&M facilities. DELIVERABLE: Concept site plan identifying general site constraints and buildout potential.
- Site Selection and Screening
- ENVIRONMENTAL: Identify candidate development sites based on developer-specified criteria. Public and private databases are utilized to identify land areas that are most suitable for solar development. DELIVERABLE: Maps illustrating candidate areas and ranking of criteria utilized to identify them. Shapefiles of GIS data supporting the findings.
- Fatal Flaw Studies
- ENVIRONMENTAL: Use GIS to assemble various public and private siting constraints to provide preliminary review of a project site. DELIVERABLE: Memo of findings and GIS shapefiles (or KMZs) of potential solar sites, substations, constraints, etc.
- Permit Matrix
- ENVIRONMENTAL & CIVIL: Develop list of permits required for construction and operation of solar facility. Includes federal, state and local permits. Identify triggers and timelines for each permit or compliance issue. DELIVERABLE: Prepare permit list or matrix including timelines, contacts, fees and references.
- Federal, State, and Local Permitting
- ENVIRONMENTAL & CIVIL: Prepare and process permit applications and mitigation plans for city and county zoning authorities, state public utility commissions, and wetland agencies. Correspondence with relevant agency personnel to obtain comments. DELIVERABLE: Site, route, and conditional use permit applications and mitigation plans for regulatory agencies. Other local and state permits as required.Compile agency comments on proposed projects.
- Natural Resource Assessments and Field Studies
- ENVIRONMENTAL: Assessments include sensitive ecological communities, threatened and endangered species, native habitats, migration corridors, communal nesting and roosting areas, and the potential for animal mortality. Perform field surveys and analyze community composition, critical habitats, and potential impacts. DELIVERABLE: Data collection and analysis, reports, and maps on rare flora, fauna, birds, bats, and sensitive communities.
- Wetland Delineation and Permitting
- ENVIRONMENTAL: Delineate jurisdictional wetlands within the construction corridors. Submit to regulatory agencies for concurrence. Assess and summarize wetland impacts. DELIVERABLE: Prepare report and maps that describes the wetlands, soils, vegetation and hydrology observed in the field. Submit a permit application for proposed wetland impacts to the USACE and Soil and Water Conservation District.
- Cultural Resource Studies
- ENVIRONMENTAL: Review previously identified cultural resource properties in the project area and use predictive modeling, site assessment, and context analysis to ensure compliance. Identify, evaluate, and monitor cultural resource properties in the field to comply with local, state, and federal laws. Coordinate with SHPO and THPO. DELIVERABLE: Phase I Site Discovery Survey report evaluating known risks, plans for avoidance, field investigation, and mitigation.
- Phase I/II Environmental Site Assessments
- ENVIRONMENTAL: Identify recognized environmental conditions (RECs) indicating potential contamination risks based on ASTM Standard E1527-13. Conduct landowner interviews, visit the site, and review government records. DELIVERABLE: Phase I Environmental Site Assessment report that meets lender and other requirements.
- Reflectivity Studies
- ELECTRICAL & ENVIRONMENTAL: Reflectivity study report describing methodology, key parameters (dependent on modules/trackers etc.) and results. SGHAT(Sandia) Glint and glare results with respect to KOP’s (key observation points) Potential glare mitigation solutions. 3D models of potential glare around site (optional) and GIS shapefiles. DELIVERABLE: Report and supporting graphics
- Project Visualizations
- ENVIRONMENTAL: Create photo simulations based on site-specific photos or public-mapping photos. Represent selected solar panels and equipment to scale based on select viewing angles and elevations. DELIVERABLE: Photo renditions, electronic and hard copy, to scale with appropriate site reference data.
- Viewshed Analysis
- CIVIL & PLANNING: Create a profile sketch elevation view line of the project from neighboring properties. DELIVERABLE: Plan and profile view of the view illustrating the neighboring property, any screening proposed and the project components within that line of sight
- Landscape Plans
- PLANNING: As required by regulators, Westwood will prepare a landscape plan with seed mixtures, maintenance specifications and visual screening solutions. DELIVERABLE Landscape Plans, mixtures, maintenance plans and approximate plant material estimates
- Pollinator-Friendly Vegetation Plans
- ENVIRONMENTAL & CIVIL: Preparation of vegetation plans conforming to industry and regulatory standards for pollinator habitat. Perform site assessments as necessary to meet pollinator habitat requirements. DELIVERABLE: Vegetation plan including seed mixtures and layout. Pollinator habitat management plans. Pollinator habitat sign design and procurement.
- Preliminary Plan Set
- CIVIL & ELECTRICAL: Prepare a comprehensive plan set of the proposed project showing all project elements, project boundary, existing roadways, existing contours, proposed array, roads, inverter pads, substation location and collection. DELIVERABLE: Preliminary Plan Set
- Preliminary Earthwork Analysis
- CIVIL: Analyze the project site from a grading perspective, taking into account racking suppliers design guidelines and the existing topography. Prepare a plan set identifying proposed grading, constraints, array and estimated earthwork quantities. DELIVERABLE: Preliminary Grading Plans and earthwork quantities
- Preliminary Hydrology Studies and Modeling
- WATER RESOURCES: Model existing and proposed hydrology conditions to determine stormwater management criteria/practices, meet local permitting ordinances, determine effect on downstream properties. DELIVERABLE: Preliminary Hydrology Model and Report
- Desktop Geotechnical Review
- GEOTECHNICAL: Review local and regional publications to evaluate geotechnial conditions and geological hazards that may significantly impact design and construction. Geologic hazards include soft/loose soil, corrosive soil, earthquakes, liquefaction, volcanism, land subsidence, flooding, debris flows, rockfalls, landslides, and subsurface voids. DELIVERABLE: Desktop Geotechnical/ Geological Review Report
- Desktop Survey Constraint Map
- LAND SURVEYING: Use publicly available information and title work provided by owner to prepare a working exhibit of easements and other items that may affect properties. DELIVERABLE: Working Desktop Boundary and Encumbrance Exhibit
- Due Diligence Review
- Pre-Construction Development Support
- DC Electrical Engineering
- ELECTRICAL & CIVIL: Specify PV plant components, including modules, racking, inverter, combiner boxes, transformers and monitoring hardware. Provide wire, conduit and other critical component specification including grounding system detail and interconnection design. DELIVERABLE: Issued for construction (IFC) PV design drawings and specifications
- AC Electrical Engineering
- ELECTRICAL: Provide AC collection routing and specification including duct bank and or overhead line design from inverter pad(s) to the switchgrear or point of interconnection. DELIVERABLE: IFC civil electrical engineering design plan sheets
- Electrical Studies
- ELECTRICAL: Various studies including:AC and DC arc flash, load flow, coordination, protective relay settings, lightning risk, grounding. They are often, but not always, included in AC design and are often broken out as separate fees. DELIVERABLE: Study results, often integrated into design.
- Substation and Overhead T&D Coordination
- ELECTRICAL: Coordinate the design and specification of HV substation and switchgear equipment through use of a subcontractor. DELIVERABLE: IFC Substation plans and specifications
- 3rd Party Review and Engineering
- ELECTRICAL: Review of plan sets designed by other firms to evaluate the design for potential areas of concern as well as identify any opportunities for improvements to the project while still maintaining the design intent. DELIVERABLE: Report documenting the design concerns and value engineering opportunities.
- Civil Engineering Design
- CIVIL: Plan and design access roads, power-block grading requirements, access road cross-sections, improvements to existing intersection turn radii, grading plans, inverter pads, staging areas, site drainage, and utility crossings. DELIVERABLE: Issued for Construction (IFC) civil engineering design plan sheets
- Hydrologic/Hydraulic Modeling
- WATER RESOURCES: Model existing and proposed hydrology conditions to determine stormwater management criteria/practices, meet local permitting ordinances, determine effect on downstream properties. Provide design water depths, velocities and scour potential within the array. DELIVERABLE: Final Hydrology Model and Report
- Foundation Elevation Plan
- CIVIL: Develop plan to maintain vertical separation between array and ground elevations. May be used in pile procurement assistance. DELIVERABLE: Plan identifying elevations of the array plane in relation to the finished ground. Excel spreadsheet with locations and sizes of foundation piles.
- Geotechnical Investigations
- GEOTECHNICAL: Perform preliminary and/or final geotechnical investigations for site planning and civil, structural, and electrical design. Typical tasks include soil borings and/or cone penetration tests (CPT), test pits, electrical resistivity tests, laboratory tests, and engineering analysis. Conclusions and recommendations are presented in a report and include a summary of subsurface conditions, geologic hazards, general earthwork recommendations, and foundation and access road design parameters. DELIVERABLE: Geotechnical Exploration Report, including boring/test pit logs and laboratory test results.
- Stormwater Pollution Plans (SWPPP)
- WATER RESOURCES: Obtain NPDES permits and develop comprehensive Stormwater Pollution Prevention Plans. Coordinate with agencies to ensure timely permitting. DELIVERABLE: Report of compliance adherence or issues
- Spill Prevention, Control, and Countermeasure Plans (SPCC)
- CIVIL: Identify, compile and organize the information required for management of spills that may occur during construction or operation. Will be completed in accordance with 40 CFR 112 and applicable EPA guidance. DELIVERABLE: Report of compliance adherence or issues
- Pre-Design Pile Load Testing (Pull Testing)
- FIELD SERVICES: Perform axial (uplift and/or compression) and lateral load tests on test piles installed at the project site to optimize racking foundation type and embedment depth. Coordinate procurement, installation, and removal of test piles. Provide installation data and test results in summary data report. DELIVERABLE: Structural Pile Load Testing Data Report
- ALTA/NSPS Land Title Surveys
- LAND SURVEYING: Preparation and certification of land title surveys to most current American Land Title Association (ALTA), National Society of Professional Surveyors (NSPS) standards, showing aerial photography (optional), easements, utilities, and existing and proposed (optional) improvements. DELIVERABLE: Professionally certified ALTA/NSPS survey
- Conventional Topographic Survey
- LAND SURVEYING: Use of land survey field crews and conventional/GPS/drone technology to collect project topography, breaklines, and relevant features at the specified contour interval and detail requirements. DELIVERABLE: Topographic exhibit, CAD planimetrics and TIN surface
- High-Resolution Aerial Mapping
- AERIAL MAPPING & LAND SURVEYING: Use of Scale-Accurate Digital Imagery (SADI) to provide imagery, topographic data and planimetric data for project site evaluation and design. Includes survey Ground Control and Westwood drone or subcontracted manned aerial flight. DELIVERABLE: Digital photography for use with ALTA/NSPS survey, topography data at the appropriate DTM interval, planimetric data.
- LiDAR
- AERIAL MAPPING & LAND SURVEYING: Use of a subcontracted aircraft and laser vendor to collect LiDAR data of the project site. Data is processed in-house to provide topographic and feature data of the site. Includes survey ground truthing. LiDAR is best suited for use on project sites that have extensive vegetation, extreme variations in topography or are very large (several hundred acres or more). DELIVERABLE: Topographic point cloud data processed to create the appropriate contour interval DTM.
- Utility Crossing Matrix
- LAND SURVEYING: Review of proposed facilities on the ALTA Land Title Survey noting wind farm improvement crossings with other recorded interests, existing roads, and existing utilities, for utilization by legal counsel to organize and expedite the title curative process. DELIVERABLE: Spreadsheet summary of crossings with associated exhibit of crossing locations
- Subsurface Utility Engineering
- FIELD SERVICES: In general conformance with SUE (Subsurface Utility Engineering), use available public and private utility mapping and ALTA Survey to coordinate with utility owners to field locate, hydrovac, and demarcate underground utilities and crossings within construction corridors and around turbines. DELIVERABLE: Spreadsheet (Crossing Matrix) and GIS/KMZ files of utility locations & crossings
- Owner's Engineer Services
- ELECTRICAL, CIVIL & GEOTECHNICAL/STRUCTURAL: Represents the project owner during design, development and construction. Acts as an advocate for the owner. Inspects the design plans, timelines, perform site visits. DELIVERABLE: Inspection of the design plans and timelines. Participation in site visits and meetings.
- Retrofit Existing Facility
- ELECTRICAL: Analyze existing systems poor production or failures for potential repairs, upgrades, or expansion including inverter swaps to transformerless design, additional capacity, AC or DC coupled battery storage, addition of backup generation. DELIVERABLE: IFC electrical engineering design plan sheets
- DC Electrical Engineering
- Construction Support
- Construction Staking
- LAND SURVEYING: Survey crews stake electrical infrastructure (collection system, combiner boxes, poles, etc.), civil components (grading, roads, fences, approaches, removals, etc.) and structural items (piles, offsets, inverter pads, etc.) DELIVERABLE: Infrastructure staked to plan and according to construction contractor specifications
- Production Pile Load Testing
- GEOTECHNICAL: Perform axial (uplift and/or compression) and/or lateral pile load tests on production piles to service loads to verify conformance with the design and code. DELIVERABLE: Production pile load testing data report
- Construction/ Post-Construction Monitoring, Inspections, and Compliance
- POTENTIAL FOR ALL SERVICES: Validate the project is constructed as per industry codes and standards and the design documentation and is complete and is capable of producing energy as designed. DELIVERABLE: NPDES Permitting & Compliance Monitoring Reports
- Record Drawings
- ELECTRICAL & CIVIL: Provide revised drawings that indicate all installed deviations from IFC drawings. DELIVERABLE: Record Drawings
- Post-Construction ALTA/NSPS Survey
- AERIAL MAPPING & LAND SURVEYING: Utilize aerial mapping planimetric data, conventional/GPS survey or drone technology to update the ALTA/NSPS survey to reflect actual constructed locations of project improvements and address updates to title documents. DELIVERABLE: Certified ALTA survey depicting updated title information and record locations of project improvements.
- Interconnection Coordination
- ELECTRICAL: Coordinate utility interconnection process including required equipment modifications, operational protective equipment settings, testing procedures and agreements. DELIVERABLE: Meeting minutes as required to document coordination and agreements with utility representatives
- Performance Verification
- ELECTRICAL: Calculate energy production and system performance over a period of time based on ASME performance standards. Evaluate monitoring/SCADA data accuracy, sort and process acceptable data, and verify performance using set criteria. DELIVERABLE: Report of system performance
- Contaminated Soil Remediation
- ENVIRONMENTAL: Conduct excavation and disposal of contaminated soils and debris. Develop remediation plans, coordinate with regulatory agencies, perform cleanup confirmation sampling and secure close-out letters. DELIVERABLE:Soil Remediation, Implementation Report, Agency Close-out requests
- Construction Staking
- Site Evaluation & Permitting Support
Commercial Rooftop Solar
- Site Evaluation & Permitting Support
- Energy Production Estimates
- ELECTRICAL ENGINEERING: Estimate energy production based on a desktop review of available resources and climate conditions through PVsyst modeling. Compare and contrast equipment specifications based on energy production and site utilization. Compare production to empirical local energy data and models for behind-the-meter applications. DELIVERABLE: Energy Production report of available resources, specified equipment, and monthly and hourly energy production databases.
- Comparative Analysis of Design Options
- ELECTRICAL ENGINEERING: Modeling iterations in PVsyst to compare various project technologies and layouts. Iterations may include adjustments for row spacing, title angle, loss factors, and project location. DELIVERABLE: PVsyst modeling outputs and/or memo or table of findings
- Conceptual Site Plan
- ELECTRICAL ENGINEERING: Use aerial photography and field assessments to locate and map the solar plant, shading obstacles and major required infrastructure improvements including racking, collection system, and interconnection location. DELIVERABLE: Concept site plan identifying general site constraints and buildout potential.
- Site Feasibility and Energy Usage Assessments
- ELECTRICAL ENGINEERING: Site visit to verify measurements of the roof area, solar access, electrical interconnection and construction logistics.DELIVERABLE:Report summarizing site visit findings. May include incorporation of findings into other products.
- Interconnection Application Support
- ELECTRICAL ENGINEERING: Complete utility interconnection applications. Typical application includes plant design parameters, equipment specifications, one-line diagrams, and site plan. Post-application utility studies may include detailed transformer and switchgear specifications, short circuit, load flow, and protective coordination studies. DELIVERABLE:Completed Interconnection Application, accompanying materials, and Queueing Forms.
- Energy Production Estimates
- Pre-Construction Development Support
- Inventory and Roof Surveys
- LAND SURVEYING: Use survey field crews, conventional/GPS, and drone survey technology to create a detailed understanding of the roof surface. DELIVERABLE: CAD data, and high res photos to incorporation into other products.
- Structural Engineering Coordination
- GEOTECHNICAL/STRUCTURAL ENGINEERING: During the system design, coordinate with racking and building structural engineers to verify the roof can support the imposed loads of the solar system. DELIVERABLE: Issued For Construction (IFC) structural engineering design plans signed by racking engineer and verified by building engineer.
- Electrical Engineering Design
- ELECTRICAL: Specify major PV plant components, including modules, racking, inverter, combiner boxes, and transformers. Design AC and DC portions of array, manage interaction with other rooftop equipment, and design interconnection with building and utility. Provide wire, conduit, grounding and other critical component specifications. DELIVERABLE: IFC electrical engineering design plan sheets
- Communication Systems Coordination
- ELECTRICAL: Coordinate with client's selected vendors for monitoring, security, and/or SCADA systems. Incorporate designs from those systems into the electrical IFC drawings. DELIVERABLE: IFC electrical engineering design plan sheets incorporating vendor elements
- EPC Bid Assistance
- ELECTRICAL & GEOTECHNICAL/STRUCTURAL: Preliminary design layouts, preliminary production analysis, preliminary quantity take-offs for electrical materials. Level of detail is generally less than individual design products. DELIVERABLE: Preliminary site plans and onelines with take-off quantity tables
- Request for Proposal (RFP) Management
- ELECTRICAL: Organize pre-design documents and site knowledge into an RFP. Options include solicitations from Owners to 3rd Party Developers for turnkey proposals, and Owner/Developers to EPC/BOP Contractors for construction bids. Can be modified to typical specification formats for government bids. Includes pre- and post-bid management. DELIVERABLE: Bound document with bidding instructions, bid forms, and all site design and knowledge accumulated to date.
- Inventory and Roof Surveys
- Construction Support
- Construction Observation
- ELECTRICAL: Field observation of contractor's work including design tolerance monitoring, equipment verification, and code-based installation requirements. Work with EPC on design changes as field conditions warrant. DELIVERABLE: Evaluation of adherence to electrical design plans and status updates
- Construction Observation
- Site Evaluation & Permitting Support
Energy Storage
- Site Evaluation & Permitting Support
- Design Support
- Foundation Design
- GEOTECHNICAL/STRUCTURAL: During the PV plant design, review rack loading, geotechnical information, hydrology study, and pile load test results to optimize the foundation design for racking and inverter pad/skids, and other ancillary equipment. Perform corrosion evaluation based on laboratory and field test results. Foundation designs include driven steel piles, concrete drilled shafts, helical anchors, ballast foundations, and reinforced concrete pads. DELIVERABLE: Issued For Construction (IFC) foundation design drawings with details, notes, and specifications. Calculation reports are also included.
- Foundation Design
- Construction Support
Information
- Description
- Construction / Engineering Mind Map on Solar & Storage OMS - 12/19/18, created by Michael Moriarity on 19/12/2018.