GoConqr has a new look! Let us know what you think.

Mind map

Aquatics Center

Chloe Bolton English

Map content

Aquatics Center

  1. Sustainability

    • Materials
      • Timber
        • Disadvantages
          • Can be vulnerable to
            • water damage
            • fire
            • decay
        • Advantages
          • Sustainable + small carbon footprint
          • Good strength
          • Can be recycled
          • Easy + fast construction
          • Light weight
      • Concrete
        • Advantages
          • Durable
          • Cast to any shape
          • Resistant to wind and water
          • Fire proof
        • Disadvantages
          • Low tensile strength - needs reinforcement
          • less ductile
          • Low strength to weight ratio
          • Efflorescence
      • Steel
        • Advantages
          • High strength to weight ratio
          • Easily fabricated
          • Flexible
          • Durable
        • Disadvantages
          • Susceptible to corrosion
          • High maintenance costs
          • Not fireproof
            • Extensive fireproofing costs
      • Masonry
        • Advantages
          • Non-combustable
          • Good thermal mass
          • Aestetically pleasing
          • Good in compression
        • Disadvantages
          • Heavy
          • Long construction time
          • rely entirely on foundations for stability
    • Construction Method
      • Offsite
        • Reduced waste
          • Exact specifications
          • Factory based working more efficient
        • Reduced time onsite
          • Less disruptive for locals
            • Less noise
            • Less ground disturbance
            • Less construction traffic
        • Improved quality control
          • No effect of weather
        • More energy efficient
          • Less materials for transportation
          • Less heavy machinery
      • On-site
        • Allows for later design changes
        • Weather can cause problems
          • Rain cause ground to be saturated
        • Lots of construction traffic
          • delivering materials
    • Transportation of materials
      • Local Materials
      • Use greener vehicles
        • Electric
      • Fabricate off-site
        • Reduces amount to be transported
    • Construction waste
      • Plan properly
        • Comprehensive plans
          • Gantt chart
        • Correct dimensions given
        • Keep check of all inventory
          • Reduces additional material deliveries
      • Three R's
        • Reduce
        • Reuse
        • Recycle
  2. Sites

    • Potential locations
      • Canning Dock
      • Albert Dock
      • Salthouse Dock
    • Site constraints
      • Environmental constaints
        • Potential flooding
        • high winds
        • wildlife
      • Unexploded bombs
      • existing structures
        • condition of existing structures
          • Can they be used for support
        • underground structures
          • mersey tunnel
        • effect of construction on existing buidlings
        • limits to construction
          • Assesibility

Information

Description
Mind Map on Aquatics Center, created by Chloe Bolton on 10/03/2019.
Created by
Chloe Bolton
Views
11
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?