Mind map
Aquatics Center
Map content
Aquatics Center
Sustainability
- Materials
- Timber
- Disadvantages
- Can be vulnerable to
- water damage
- fire
- decay
- Can be vulnerable to
- Advantages
- Sustainable + small carbon footprint
- Good strength
- Can be recycled
- Easy + fast construction
- Light weight
- Disadvantages
- Concrete
- Advantages
- Durable
- Cast to any shape
- Resistant to wind and water
- Fire proof
- Disadvantages
- Low tensile strength - needs reinforcement
- less ductile
- Low strength to weight ratio
- Efflorescence
- Advantages
- Steel
- Advantages
- High strength to weight ratio
- Easily fabricated
- Flexible
- Durable
- Disadvantages
- Susceptible to corrosion
- High maintenance costs
- Not fireproof
- Extensive fireproofing costs
- Advantages
- Masonry
- Advantages
- Non-combustable
- Good thermal mass
- Aestetically pleasing
- Good in compression
- Disadvantages
- Heavy
- Long construction time
- rely entirely on foundations for stability
- Advantages
- Timber
- Construction Method
- Offsite
- Reduced waste
- Exact specifications
- Factory based working more efficient
- Reduced time onsite
- Less disruptive for locals
- Less noise
- Less ground disturbance
- Less construction traffic
- Less disruptive for locals
- Improved quality control
- No effect of weather
- More energy efficient
- Less materials for transportation
- Less heavy machinery
- Reduced waste
- On-site
- Allows for later design changes
- Weather can cause problems
- Rain cause ground to be saturated
- Lots of construction traffic
- delivering materials
- Offsite
- Transportation of materials
- Local Materials
- Use greener vehicles
- Electric
- Fabricate off-site
- Reduces amount to be transported
- Construction waste
- Plan properly
- Comprehensive plans
- Gantt chart
- Correct dimensions given
- Keep check of all inventory
- Reduces additional material deliveries
- Comprehensive plans
- Three R's
- Reduce
- Reuse
- Recycle
- Plan properly
- Materials
Sites
- Potential locations
- Canning Dock
- Albert Dock
- Salthouse Dock
- Site constraints
- Environmental constaints
- Potential flooding
- high winds
- wildlife
- Unexploded bombs
- existing structures
- condition of existing structures
- Can they be used for support
- underground structures
- mersey tunnel
- effect of construction on existing buidlings
- limits to construction
- Assesibility
- condition of existing structures
- Environmental constaints
- Potential locations
Information
- Description
- Mind Map on Aquatics Center, created by Chloe Bolton on 10/03/2019.
- Created by
- Chloe Bolton
- Views
- 11
- Rating