SAB7#43_SCOPE_LEVELS
  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        Transition Metals
        Madeleine.Dc
        Chemistry 1
        kelsey.le.grange
        Computing
        Ben Leader
        Themes in Lord of the Flies
        lowri_luxton
        Study Schedule- this week (1)
        Lavinia Hayde
        Revolutions and Turmoil: Russia 1905-1917
        Emily Faul
        Key Biology Definitions/Terms
        jane zulu
        Psychology 115 Final Exam Review
        HighBounce
        Organic Chemistry
        Megan Tarbuck
        Power and Conflict Poetry
        Charlotte Woodward
        Clinical Pathoanatomy MCQs (Q 151-250)
        Ore iyanda