Help shape GoConqr. What should we add next?

Mind map

What Makes a Competent International Project Manager in Emerging and Developing Countries

Kevin Lobo English

What Makes a Competent International Project Manager in Emerging and Developing Countries

Map content

What Makes a Competent International Project Manager in Emerging and Developing Countries

  1. 1) Introduction

    • International projects are characterized with high level of complexity, uncertainty, and risk.
    • Problems related to international projects: project appeal in the eyes of politicians, profound cultural and geographical gaps among the stakeholders, and the prevalence of bureaucratic rules and procedures.
    • Project managers have to “deal with complexity, resistance to change, competing agendas of a large number of stakeholders, and diverse and even contradictory expectations” in international projects
    • Project managers should have adequate competences, so that they can ensure project success in a highly complex and uncertain environment
  2. 2) Literature Review

    • Competence
      • Can be defined as knowledge, skills, attitudes, and behaviors that are associated with job performance
      • Generally refers to functional areas and is regarded to be job related
    • Competency
      • Is a person related concept, which refers to “the dimensions of behavioral action underlying competent performance”
      • Implies behavioral areas and is considered to be person related
    • Perspectives From Professional Institutes
      • The Project Management Institute (PMI)
        • Project Manager Competency Development (PMCD) Framework defines three competences
          • Knowledge
            • What a project manager knows about project management processes, tools, and techniques
          • Performance
            • How a project manager applies knowledge to satisfy project requirements
          • Personal Attributes
            • How a project manager behaves when performing project activities, including the attitude and core personality characteristic
      • The International Project Management Association (IPMA)
        • Individual Competence Baseline (ICB) proposes 29 competence elements in three areas
          • People
          • Practice
          • Perspective
      • Australian Institute of Project Management (AIPM)
        • Professional Competency Standards for Project Management: defines performance competencies and the underpinning knowledge and skills based on nine knowledge areas
      • Global Alliance for Project Professions (GAPPS)
        • Identifies the common elements by comparing the existing project management standards (e.g., PMI, IPMA, AIPM), and proposes an assessment framework for project managers in the form of performance-based competency standards (PBCS)
    • Perspectives in Project Management Literature
      • Overall, prior studies mostly aim at sorting the competences in order of importance for international project managers.
      • Further empirical investigation is necessary to understand and categorize international project manager competences in a more structured way.
      • Stevenson and Starkweather (2010) identify several core IT project manager competences, such as leadership, communication ability, verbal skills, written skills, attitudes, and change management ability
  3. 3) Research Method

    • Data Collection
      • Reports of 26 international project managers nominated by China International Contractors Association (CHINCA)
    • Qualitative Data Analysis: Content Analysis Method
      • Step1. Conducing literature to create codebook
      • Step 2. Precoding and modifying the codes
      • Step 3. Open coding on the text to attach the codes to all related text units
      • Step 4. Grouping the conceptually similar codes into abstract categories
    • Quantitative Data Analysis: MDS method
      • Step 5. Computing proximities between each pair of categories
      • Step 6. Extracting a number of dimensions to establish MDS models using Proxscal algorithm
      • Step 7. Producing a two-dimensional MDS map to visualize the main features of the data
  4. 4) Results, Analysis & Discussion

    • Competence Dimensions
      • Dimension 1: Efficiency Oriented Versus Effectiveness Oriented
        • Left Side
          • Efficiency: Related to doing things in a right way, which indicates that PMs must control resources and processes within time, cost, and quality constraints.
          • Most competences on the left side reflect how efficiently international PMs manage resources and processes to achieve the organization's operational goals.
          • These efficiency-oriented competences represent the basic requirements for an international project manager.
        • Right Side
          • Effectiveness: Related to doing the right thing, which indicates the degree to which stakeholder expectations are met and the minimization of external changes to deliver business benefits
          • Competences of the right side reflect how effectively international PMs interact with their stakeholders, such as team members, suppliers, and third parties, and how effectively they respond to the external changing environment.
      • Dimension 2: Input Focused Versus Output Focused
        • Upside
          • Output-focused competences: Project managers’ abilities to achieve project objectives, such as cost, quality, schedule, and stakeholder satisfaction.
        • Downside
          • Input-focused competences: knowledge, skills, and abilities that project managers bring to the project to support project implementation processes
    • Competence Sets
      • Set 1: Fundamental Knowledge and Skills
        • Utilizing expert knowledge, decision making ability, knowledge of international standards, learning ability, technical skills, and verbal skills
      • Set 2: Project Management Goals-Oriented
        • Cost control, quality management, schedule management, resource management, business mind, and resource management
      • Set 3: Uncertainty and Change Management
        • Contract management, design optimization and management, adaptation, risk management, proactive planning, change and claim management, routinization
      • Set 4: Internal & External Stakeholder Management
        • Social responsibility, procurement, localization management, communication skills, dedication, third-party management, team building and development
    • Theoretical & Managerial Implications
      • International projects share some common characteristics with traditional domestic projects
      • International projects in emerging and developing countries are special due to their high levels of uncertainty, complexity, and institutional distances.
      • Project managers should carry out effective uncertainty management through proactive planning, routinization, and adaptation
      • The study indicates utilizing expert knowledge to solve complex problems and understanding international standards in the set of fundamental knowledge and skills necessary for international project managers
      • The competences serve as the criteria for their self-selection and career planning. Furthermore, we suggest that individuals consciously develop key competences for their career in today’s international business environment

Images and files in the map

  • What Makes a Competent International Project Manager in Emerging and Developing Countries
  • What Makes a Competent International Project Manager in Emerging and Developing Countries
  • What Makes a Competent International Project Manager in Emerging and Developing Countries

Information

Description
Mind Map on What Makes a Competent International Project Manager in Emerging and Developing Countries, created by Kevin Lobo on 17/08/2021.
Created by
Kevin Lobo
Views
0
Rating

Feedback

What is it about?

What should we add next?