RIBA PLAN 2013 consultation

alison_patey0437
Mind Map by , created over 6 years ago

Mind Map on RIBA PLAN 2013 consultation, created by alison_patey0437 on 05/08/2013.

69
2
0
Tags No tags specified
alison_patey0437
Created by alison_patey0437 over 6 years ago
Macbeth Notes
Bella Ffion Martin
B2, C2, P2
George Moores
GCSE French - Parts of the Body
Abby B
Salesforce Admin 201 Exam Chunk 3 (66-90)
Brianne Wright
Present Simple Vs Present Continuous
Luis Alcaraz
English Vocabulary
Niat Habtemariam
Physics - Energy, Power & Work
dominique22
Health and Social Care
NicoleCMB
The Great Gatsby: Chapter Summaries
Andrew_Ellinas
CHEMISTRY C1 6
x_clairey_x
RIBA PLAN 2013 consultation
1 INTEGRATE CHANGES
1.1 Sustainability
1.2 BIM
1.3 Building services design
1.4 UK Gov construction stategy
2 OLD RIBA STAGE
2.1 A: Appraisal
2.1.1 B: Design Brief
2.1.1.1 C: Apraisal
2.1.1.1.1 D: Design Development
2.1.1.1.1.1 E: Technical Design
2.1.1.1.1.1.1 F1 & F2: Production information
2.1.1.1.1.1.1.1 G: Tender Documentation
2.1.1.1.1.1.1.1.1 H: Tender Action
2.1.1.1.1.1.1.1.1.1 J: Mobilisation
2.1.1.1.1.1.1.1.1.1.1 K: Construction to PC
2.1.1.1.1.1.1.1.1.1.1.1 L: Post PC
3 NEW RIBA STAGE
3.1 1: PREPARATION
3.1.1 2: CONCEPT DESIGN
3.1.1.1 3: DEVELOPED DESIGN
3.1.1.1.1 4: TECHNICAL DESIGN
3.1.1.1.1.1 5: SPECIALIST DESIGN
3.1.1.1.1.1.1 6: CONSTRUCTION (OFF + ONSITE)
3.1.1.1.1.1.1.1 7: USE AND AFTERCARE
4 PROPOSALS
4.1 Abolish A - L stages and replace with 7 point schedule of works incorporating:
4.1.1 intellegent commissioning
4.1.2 soft landings
4.1.3 project outcomes
4.1.4 differing stages of planning
4.1.5 UK & international use
4.1.6 Private + public sector
4.1.7 Differing project sizes
5 KEY CHANGES
5.1 Work stages reduced from 11 to 7 & aligned with the CIC sch of services
5.2 Stages A & B have been merged into 1 intitial 'preparation stage'
5.3 Stages F to L have been simplified and re-numbered
5.4 Job specific flexibility replaces the single description of tasks used in the Plan of works 2007
5.5 Planning is accounted for in the design process
5.6 Sustainability and BIM have been incorporated with the introduction of BIM 'overlay' and 'Green Overlay'
6 GREEN OVERLAY
6.1 Provides a framework for the inclusion of sustainability in the apprisal, breifing, design and construction process.
6.2 the overlay takes the existing plan as a starting point add guidance notes and highlights additional actions to promote the construction of sustainable buildings.