RIBA PLAN 2013 consultation

Description

Mind Map on RIBA PLAN 2013 consultation, created by alison_patey0437 on 08/05/2013.
alison_patey0437
Mind Map by alison_patey0437, updated more than 1 year ago
alison_patey0437
Created by alison_patey0437 almost 11 years ago
87
2

Resource summary

RIBA PLAN 2013 consultation
  1. INTEGRATE CHANGES
    1. Sustainability
      1. BIM
        1. Building services design
          1. UK Gov construction stategy
          2. OLD RIBA STAGE
            1. A: Appraisal
              1. B: Design Brief
                1. C: Apraisal
                  1. D: Design Development
                    1. E: Technical Design
                      1. F1 & F2: Production information
                        1. G: Tender Documentation
                          1. H: Tender Action
                            1. J: Mobilisation
                              1. K: Construction to PC
                                1. L: Post PC
            2. NEW RIBA STAGE
              1. 1: PREPARATION
                1. 2: CONCEPT DESIGN
                  1. 3: DEVELOPED DESIGN
                    1. 4: TECHNICAL DESIGN
                      1. 5: SPECIALIST DESIGN
                        1. 6: CONSTRUCTION (OFF + ONSITE)
                          1. 7: USE AND AFTERCARE
              2. PROPOSALS
                1. Abolish A - L stages and replace with 7 point schedule of works incorporating:
                  1. intellegent commissioning
                    1. soft landings
                      1. project outcomes
                        1. differing stages of planning
                          1. UK & international use
                            1. Private + public sector
                              1. Differing project sizes
                            2. KEY CHANGES
                              1. Work stages reduced from 11 to 7 & aligned with the CIC sch of services
                                1. Stages A & B have been merged into 1 intitial 'preparation stage'
                                  1. Stages F to L have been simplified and re-numbered
                                    1. Job specific flexibility replaces the single description of tasks used in the Plan of works 2007
                                      1. Planning is accounted for in the design process
                                        1. Sustainability and BIM have been incorporated with the introduction of BIM 'overlay' and 'Green Overlay'
                                        2. GREEN OVERLAY
                                          1. Provides a framework for the inclusion of sustainability in the apprisal, breifing, design and construction process.
                                            1. the overlay takes the existing plan as a starting point add guidance notes and highlights additional actions to promote the construction of sustainable buildings.
                                            Show full summary Hide full summary

                                            Similar

                                            The Heart
                                            annalieharrison
                                            AS-Level Chemistry: Unit 1:The Atom
                                            Daena Targaryen
                                            AQA - English Language Unit 1
                                            Alice Love
                                            Attachment - Psychology - Flash Cards
                                            Megan Price
                                            Psychology flashcards memory
                                            eharveyhudl
                                            GCSE AQA Physics - Unit 2
                                            James Jolliffe
                                            History- Religion and medicine
                                            gemma.bell
                                            Key policies and organisations Cold War
                                            E A
                                            The Tempest Key Themes
                                            Joe Brown
                                            Frankenstein - Mary Shelley
                                            Johnny Hammer
                                            Salesforce Admin 201 Exam Chunk 3 (66-90)
                                            Brianne Wright