O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

ICT Chapter 5

Noah MC Inglês

Conteúdo do mapa

ICT Chapter 5

  1. Feasibility study and evaluation criteria

    • Desired outcomes
      • List of system neccessary functions in genreal terms
      • E.g. for school website
        • Accessable for all
        • Up-to-date material that will be covered over the yaer
        • Allow students to add messages to message board
        • Provide links to exam boards and other revsion material
        • Make full use fo multimedia featrues
        • Allow students to access resources from class
    • Evaluation criteria
      • Miles stones that will determine success of a project
      • Important to establish at design stage:
      • Broken into two sections
        • Desired outcones
        • Performance criteria
    • Purpose of feasibility study
      • Tries to find out the cost of a new system and the time it will take to be created
      • Checks if its worth creating
      • Checks if benefits will outweigh the production costs
      • Decision on whether or not to create a new system will be made
    • Fact finding and possible methods
      • Ways of collecting feedback
        • Questionnaires
        • Interviews
        • Observations
        • Inspection of records
    • Performance criteria
      • Used to see if the desired outcomes have been met
      • E.g. for school website
        • Does the new website attract more users than previous one
        • Do users find the content is better
        • Can they fin the info using the search facility
        • Do all pages load in a reasonable time
        • Can the students understand material on website
  2. Stages of the System life cycle

    • Stages involved in producing a new ICT system
      • Step 1: Feasibility study
      • Step 2: Analysis
      • Step 3: Design
      • Step 4: Implementation
      • Step 5: Testing
      • Step 6: training and documentation
      • Step 7:Evaluation and monitoring
      • Step 8: Maintenance
    • Analysis
      • Looks in detail at current requirements a task never been performed before, 5 main steps
        • 1: Identifying the probelm
        • 2: Understanding current system
        • 3: Understanding proposed system , if no existing system
        • 4: Identifying desired outcomes
        • 5: Setting up performance criteria
      • Feasibility study often done as first part of analysis
    • Design
      • During design, analyst will take desired outcomes and plan how to best create the system.
      • 6 stages in design process
        • 1: Designing system in line with desired outcomes.
        • 2: Choosing methods for input, storage and output
        • 3: Deciding on type of processing to be performed on data
        • 4: Designs of input screens, output screens?reports, layouts of spreadsheet, databases, etc
        • 5: designing validation tests
        • 6: Designing test plans
    • Test plans
      • To make sure tests are accurate, you should:
        • 1:Tests are numbered
        • 2:Each test has clear data for test use
        • 3:Stated reason for each test
        • 4:Expected result stated
      • Space should be left for:
        • 1:Actual result and comment on result
        • 2: Page number reference to where hard copy can be found
    • Implementation
      • Stage where system is built according to design
      • Stages of implementation:
        • 1:Constructing system against design criteria
        • 2:Programmers producing any code needed for working solution
        • 3:Producing framework for databases
        • 4:Using software tools to produce a working version
        • 5:Modifying existing software
        • 6:Producing a working system according to desired outcomes
    • Testing
      • Test plan created during desing stage now used
      • Testing may involve the following:
        • 1:Entering test data as specified in test plan created during design stage
        • 2:Comparing results with what should have happened and making changes to validation checks if needed
        • 3:If a website is being produced, testing it to ensure the content is correct, the links work and the navigation is easy to use
        • 4:Comparing results of of calculations with those produced manually
        • 5:Checking that the validation checks work with typical, extreme and erroneous data
    • User training and documentation
      • Users need to be trained to use the new system
      • User documentation is a document users can turn to for learning a new procedure or a problem that has come up
    • Evaluation and monitoring
      • Takes place soon after implentation
      • Only then users will find out any problems with system
      • Usually involve the following:
        • 1:Checking original user and performance criteria have been fully met by new system
        • 2:Assessment of client satisfaction with development of new system
        • 3:Setting up a cycle to ensure system is checked peroidically to make sure its still meeting requirements

Informações

Descrição
Mapa Mental sobre ICT Chapter 5, criado por Noah MC em 21-03-2015.
Criado por
Noah MC
Visualizações
1
Avaliação

Mais sobre Feasibility Study

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?