Feasibility study and evaluation criteria
- Desired outcomes
- List of system neccessary functions in genreal terms
- E.g. for school website
- Accessable for all
- Up-to-date material that will be covered over the yaer
- Allow students to add messages to message board
- Provide links to exam boards and other revsion material
- Make full use fo multimedia featrues
- Allow students to access resources from class
- Evaluation criteria
- Miles stones that will determine success of a project
- Important to establish at design stage:
- Broken into two sections
- Desired outcones
- Performance criteria
- Purpose of feasibility study
- Tries to find out the cost of a new system and the time it will take to be created
- Checks if its worth creating
- Checks if benefits will outweigh the production costs
- Decision on whether or not to create a new system will be made
- Fact finding and possible methods
- Ways of collecting feedback
- Questionnaires
- Interviews
- Observations
- Inspection of records
- Ways of collecting feedback
- Performance criteria
- Used to see if the desired outcomes have been met
- E.g. for school website
- Does the new website attract more users than previous one
- Do users find the content is better
- Can they fin the info using the search facility
- Do all pages load in a reasonable time
- Can the students understand material on website
- Desired outcomes
Stages of the System life cycle
- Stages involved in producing a new ICT system
- Step 1: Feasibility study
- Step 2: Analysis
- Step 3: Design
- Step 4: Implementation
- Step 5: Testing
- Step 6: training and documentation
- Step 7:Evaluation and monitoring
- Step 8: Maintenance
- Analysis
- Looks in detail at current requirements a task never been performed before, 5 main steps
- 1: Identifying the probelm
- 2: Understanding current system
- 3: Understanding proposed system , if no existing system
- 4: Identifying desired outcomes
- 5: Setting up performance criteria
- Feasibility study often done as first part of analysis
- Looks in detail at current requirements a task never been performed before, 5 main steps
- Design
- During design, analyst will take desired outcomes and plan how to best create the system.
- 6 stages in design process
- 1: Designing system in line with desired outcomes.
- 2: Choosing methods for input, storage and output
- 3: Deciding on type of processing to be performed on data
- 4: Designs of input screens, output screens?reports, layouts of spreadsheet, databases, etc
- 5: designing validation tests
- 6: Designing test plans
- Test plans
- To make sure tests are accurate, you should:
- 1:Tests are numbered
- 2:Each test has clear data for test use
- 3:Stated reason for each test
- 4:Expected result stated
- Space should be left for:
- 1:Actual result and comment on result
- 2: Page number reference to where hard copy can be found
- To make sure tests are accurate, you should:
- Implementation
- Stage where system is built according to design
- Stages of implementation:
- 1:Constructing system against design criteria
- 2:Programmers producing any code needed for working solution
- 3:Producing framework for databases
- 4:Using software tools to produce a working version
- 5:Modifying existing software
- 6:Producing a working system according to desired outcomes
- Testing
- Test plan created during desing stage now used
- Testing may involve the following:
- 1:Entering test data as specified in test plan created during design stage
- 2:Comparing results with what should have happened and making changes to validation checks if needed
- 3:If a website is being produced, testing it to ensure the content is correct, the links work and the navigation is easy to use
- 4:Comparing results of of calculations with those produced manually
- 5:Checking that the validation checks work with typical, extreme and erroneous data
- User training and documentation
- Users need to be trained to use the new system
- User documentation is a document users can turn to for learning a new procedure or a problem that has come up
- Evaluation and monitoring
- Takes place soon after implentation
- Only then users will find out any problems with system
- Usually involve the following:
- 1:Checking original user and performance criteria have been fully met by new system
- 2:Assessment of client satisfaction with development of new system
- 3:Setting up a cycle to ensure system is checked peroidically to make sure its still meeting requirements
- Stages involved in producing a new ICT system
Información
- Descripción
- Mapa Mental sobre ICT Chapter 5, creado por Noah MC el 21/03/2015.
- Creado por
- Noah MC
- Visitas
- 1
- Valoración