Mapa mental
Risk & Uncertainty
Conteúdo do mapa
Risk & Uncertainty
'disaster' projects
- fail 2 out of
- 1. >40% cost growth
- 2. >40% time slippage
- 3. produce <50% than 1st year plan
- 1/8 major project -> disaster
- the bigger, >important project gets -> >likely -> disaster
- fail 2 out of
problem: business outcome not up to expectations/ possibilities
- better decisions
- accurate = unbiased + appropriate range
- uncertainty assessment & response
- non-intuitive
- lead to better performances
- supported by petrol. geoscientist, engineers, economist
- Reasons
- under-estimate: uncertain factors (no. & magnitude), complexity of uncertainties' relationships, consequences
- systematic biases: mental short-cuts
- planning fallacy
- spin success scenarios, overlook potential of mistake & miscalculations - believe in outcomes: unlikely come in budget/time - unexpected returns
- proceed on beliefs, judgments of P but not uncertainty
- better decisions
UNCERTAINTY
- not remove but accurately assess
- uncertainty assessment
- priority
- 1. accurate (unbiased)
- 2. uncertainty reduction (> data,time,detail, analysis)
- 3. stop when further analysis don't change decision
- 2. uncertainty reduction (> data,time,detail, analysis)
- 1. accurate (unbiased)
- priority
- knowing when enough is enough
- defin: not knowing if the statement/ even is true/false
- predictions: range/list possible outcomes
- language of uncertainty
- probabilities
- scientific way to deal with uncertainty
- systematically quantify beliefs about uncertainty
- rules pf probability -> how to reason logically under uncertainty
- chance of possible outcomes occur
- views
- Classical (Theoretical)
- no. outcomes represent / total no. possible outcomes (3 red, 7 green -> P(red)=3/10)
- Relative Frequency
- probability ESTIMATED from sample data ASSUME identical events (15/20 sample wells: dry -> P(dry)=75%)
- bigger sample -> more accurate P
- Subjective
- personal degree of belief of likelihood of a future event occur
- can based on data, pass similar occurances
- Oil & industry ( exist: unknowable possible outcomes, distribution, parameters)
- Classical (Theoretical)
- probabilities
- function of not a system but what known about the system, function of personal state of information
- RISK
- possible -ve consequence of uncertainty
- OPPORTUNITY
- possible +ve consequence of uncertainty
Variability
- distribution that describes variability of a natural phenomenon is not usually appropriate to describe uncertainty of a single occurance
Ambiguity
- imprecise (unclear) definition of event/ statement/ outcome (wine-drinker)
- must be removed from uncertainty statement before assign probability
often estimate in 80% Confidence Intervals
- goal is set a range narrow enough to contain actual value >8/10times on ave
Bias
- optimistic on central value (mean)
- width of distribution
Informações
- Descrição
- Mapa Mental sobre Risk & Uncertainty, criado por Hoa Truong em 19-11-2015.
- Criado por
- Hoa Truong
- Visualizações
- 0
- Avaliação