O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT (Modified)

Roman Velasquez Taller de Certificación PMI PMP Espanhol

Conteúdo do mapa

SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT (Modified)

  1. Project Management Plan

    • Scope Baseline
  2. Project Charter

    • High-Level Milestones
  3. EEF´s

    • Culture, PMIS
  4. OPA´s

    • Templates, Learned Lessons
  5. Plan Schedule Management

    • SCHEDULE MANAGEMENT PLAN
      • Includes: Scheduling Methodology and Scheduling SW to be used. Rules for how estimates should be stated. Establishment of a Schedule Baseline.Identification of the performance meausures. Determination of acceptable variance. How Schedule variances will be identified and managed. Identification of Schedule Change Control Procedures. Reporting Formats to be used.
    • Define the processes to plan & control the schedule
  6. Define Activities

    • List of all of the Activities that will need to be completed. It is the basis for the Network Diagram
  7. Sequence Activities

    • Figure out which activities need to come before others and put them in the right order.
    • Project Schedule Network Diagram
  8. Estimate Activity Resources

    • Who and what are needed to get the project done.
  9. Estimate Activity Durations

    • Time it will take to do each activity.
  10. Develop Schedule

    • Build a Schedule from all of the estimates and the resource and activity information. It Predicts the Project End Date.
  11. Control Schedule

    • Monitor and Control Changes to the Schedule to make sure that is kept up to date.
    • PREGUNTA DE EXAMEN: Debe llevar un orden o son aleatorios ? los componentes grises ? DEBE LLEVAR UN ORDEN! el calendario es lo ultimo
  12. Tools: Expert Judgment, Analytical Techniques, Meetings.

  13. How you will plan, manage and control the Project Schedule. Must be REALISTIC.

Informações

Descrição
PMP Taller de Certificación PMI Mapa Mental sobre SAB9#50_51_PLANNING SCHEDULE_PLAN SCHEDULE_MGMNT (Modified), criado por Roman Velasquez em 20-04-2016.
Criado por
Roman Velasquez
Visualizações
3
Histórico
  • Criado por Pedro Torres Vega · 20 abr 2016
  • Copiado por Roman Velasquez · 20 abr 2016
Avaliação

Mais sobre Schedule Management Plan

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?