Technical Memorandum

  1. Supervision

    • Building Works
    • Street works
  2. Supervision plans

    • Setting out the safety management plan of Building / Street works. Drawn up by AP, RSE, RGE, authorized signatory of registered contractor.
    • Safety Management
      • TCP
        • Keep records
          • Report on work
        • Communication
          • With other streams
        • T! / T2 / T3
      • AP / RSE / RGE / AS
        • Engineering safety supervision
          • T4 / T5
          • Principle of working methods
            • Being use on site
            • Suitable for encountered conditions
          • Check work comply with design
          • Check work comply with supervision plan
          • verifying method statments
          • Ensure safety recording
        • Routine safety supervision
          • T1 / T2 / T3
          • Meeting safety standards
          • Safety aspect checking
            • General aspect
            • Minor aspect
          • Check work compliance
            • With approved
              • Method statement
              • precautionary measures
              • Protective measures
    • Structural support
      • Plants
      • Machinery
    • Control of Sequence
      • Construction works
      • Temporary works
    • Measures to check
      • Building works
      • Street works
    • Lodged
      • With Building authority
      • At Time of application
        • Consent of works commencement
      • Pre-requisite

Informações

Descrição
HKIS Professional Exam Building Surveying Mapa Mental sobre Technical Memorandum, criado por Clara Kam em 20-10-2017.
Criado por
Clara Kam
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?