Technical Memorandum
Supervision
- Building Works
- Street works
Supervision plans
- Setting out the safety management plan of Building / Street works. Drawn up by AP, RSE, RGE, authorized signatory of registered contractor.
- Safety Management
- TCP
- Keep records
- Report on work
- Communication
- With other streams
- T! / T2 / T3
- Keep records
- AP / RSE / RGE / AS
- Engineering safety supervision
- T4 / T5
- Principle of working methods
- Being use on site
- Suitable for encountered conditions
- Check work comply with design
- Check work comply with supervision plan
- verifying method statments
- Ensure safety recording
- Routine safety supervision
- T1 / T2 / T3
- Meeting safety standards
- Safety aspect checking
- General aspect
- Minor aspect
- Check work compliance
- With approved
- Method statement
- precautionary measures
- Protective measures
- With approved
- Engineering safety supervision
- TCP
- Structural support
- Plants
- Machinery
- Control of Sequence
- Construction works
- Temporary works
- Measures to check
- Building works
- Street works
- Lodged
- With Building authority
- At Time of application
- Consent of works commencement
- Pre-requisite
Information
- Description