estimates projects
estimating projects
- Estimating
- types of estimates
- macro
- top down
- consensus methods
- Ratio method
- apportion method
- function point method for software and system projects
- top down
- micro
- bottom up
- macro
- types of estimates
- quality of estimates
- other factors
- planning horizon
- project complexity
- people
- project structure & organization
- padding estimates
- organization culture
- Estimating
preparing initial estimates
- use people familiar with the task
- use several people to make estimates
- assume normal conditions
- use consistent time units
- assume tasks are independent
- make no allowance for contingencies
- include a risk assessments
estimates
- time
- cost
- types of cost
- direct costs
- direct (projected) overhead costs
- general & admin overhead costs
- types of cost
- quality of estimates
- planning horizon
- project complexity
- people
- project structure & organization
- padding estimates
- organization culture
- other factors
- preparing initial estimates
- use people familiar with the task
- use several people to make estimates
- assume normal conditiond
- use consistent time units
- assume tasks are independent
- make no allowance for contingencies
- include a risk assessment
- refining estimates
- reasons for adjusting estimates
- overly optimistic
- Strategic misrepresentation
- changes in project scope and plans
- things go wrong on projects
- normal conditions do not apply
- interaction costs are hidden in estimates
- reasons for adjusting estimates
types of estimates
- macro top down
- consensus methods
- Ratio methods (parametric)
- apportion method
- function point methods for software and system projects
- learning curves
- micro bottom up
- template methods
- parametric procedures
- range estimates for the WBS work packages
- phase estimating a hybrid
- macro top down
preferred approach
- make rough top down estimates
- develop the WSB/OSB
- make bottoms up estimates
- develop schedules and budgets
- reconcile difference between top down & bottom up estimates
mega projects
- white whale
- often over cost & time estimates
Informações
- Descrição
- SEC V Business Studies Mapa Mental sobre estimates projects, criado por Vince Weir em 01-10-2018.
- Criado por
- Vince Weir
- Visualizações
- 0
- Histórico
-
- Criado por Vince Weir · 30 set 2018
- Copiado por Vince Weir · 1 out 2018
- Avaliação