BIM

  1. Terminology

    • definition of BIM
      • “...the process of generating and managing data about the building during its life cycle”, the NBS
    • Project information model
      • A project’s graphical and non-graphical data and documentation
    • Lonely BIM
      • Enter text here
    • Collaborative BIM
    • Soft Landings
    • 4D(time) BIM
    • COBie
    • Common data environment
    • 5D (cost) BIM
    • Common data environement
    • Data Drops
    • Pas 1192
    • 6D (=facilities management (FM) BIM
    • Interperability
    • clash detection
    • Industry foundation clashes (IFC)
    • BIM task group
    • Government BIM strategy
    • Construction Industry COuncil
    • The National BIM library
  2. Building information modelling

    • recently defined by the BIM Working Party for the Government Construction Client Group: ‘Building Asset Information Modelling
  3. What is a BIM?

    • a BIM is a database of information about a built asset
      • asset might already exist, it might partially exist (i.e. it is to be extended or is part way through construction) or it might be planned
        • database will start its life through the design process
          • when they are creating/developing their designs, will, using BIM software, create intelligent designs
    • address many of the industries failings including waste reduction, value creation and improved productivity
    • BIM becomes = primary tool for documentation where plans, schedules and bills of quantities may be derived
    • It moves away from traditional project working
      • Old Way
        • parties often work on separate information pools using several different (and usually incompatible) software packages
      • BIM way
        • all parties (including architects, surveyors and contractors) sharing, and effectively working on, a common information pool
        • BIM involves building a digital prototype of the model and simulating it in a digital world
    • BIM = common, coordinated source of structured information 4 all parties in the delivery process, e.g. design, construct, and/or operate
      • access to the same data
      • information loss associated with handing a project over from design team to construction team and to building owner/operator is kept to a minimum
    • BIM Models
      • representations of the actual parts/ pieces used to construct a building + geometry/spatial relationships/ geographic info/ quants/building components
      • BIM can be used to demonstrate the entire building lifecycle from construction through to facility operation
      • BIM provides a common environment for all information defining a building, facility or asset, together with its common parts and activities
        • building shape, design and construction time, costs, physical performance, logistics
  4. WHAT IS COBie?

    • COBie stands for Construction Operations Building Information Exchange.
      • Government Construction Strategy states = structured asset information useful to the owner operator for post occupancy decision making.”
    • COBie will become mandatory for public sector projects by 2016.
    • What??
      • COBie is a dataset which is produced as part of the Project Information Model (PIM)1, containing building/facility data
      • captures all of the facility information, except for the design which is completed using the BIM(s)
      • COBie should be read in conjunction with the BIM(s) throughout the project duration and post completion to provide a full dataset for a facility
    • History
      • UK government published its Building Information Modelling (BIM) Working Party Strategy
      • Government's intention to require collaborative 3D BIM (with all project + asset information, documentation and data being electronic) on its projects
      • software and data requirements for this detailed in the report are Construction Operations Building Information Exchange (COBie)
      • Improve the handover process to building owner-operators. A Excel spreadsheet
        • data inside a COBie spreadsheet
          • idea behind COBie is that the key information is all pulled into one format and shared between the construction team at defined stages in a project
            • information being drawings, specifications, schedules, reports
      • COBie initially developed as (FM) tool to ensure that the client receives the information in as complete and as useful format
        • It is now used for compiling project information throughout the design, construction and operation stages
    • COBie DATA
      • data required as part of COBie is no different from the information already required through design and construction contracts
      • objective = standardise the format and structure of that information to maximise its use and accessibility during design, construction and FM
      • Its a collaborative tool whereby collectively the project team is responsible for providing the data
      • Information is required at various stages within the project
        • 1. Data Drop 1 (DD1) – Client Requirements and Constraints
        • Data Drop 2 (DD2) – Outline Solution
        • Data Drop 3 (DD3) – Construction Information
        • Data Drop 4 (DD4) – Operation and Management Information (Ongoing Operations and Management)
        • Data Drop 5 (DD5) – Post Occupancy Validation Information
    • WHAT DOES COBie LOOK LIKE?
      • currently compiled and presented using a simple spreadsheet
        • this is used as an interim step to COBie specific software which allows open exchange of all project data
        • Project team members only enter the data for which they are responsible
      • products and equipment listed in design schedules should be entered into the COBie
        • Spreadsheet usually contain the following worksheet
          • Contact
            • actors and their roles
          • Facility
            • project, site and building details
          • Floor
            • Data should be split into floors
          • Zone
            • super-elements that contain multiple spaces and provide a specific function
          • Spaces
            • functional locations where operation and maintenance occurs
          • Type
            • Products and equipment noted in design schedules
          • System
            • group of components that work together to provide a specific building service e.g. ventilation
          • Component
            • Details of the products and equipment listed in the design schedules
      • Completion of COBie sheets
        • 1. Initially the ‘Contact’ and ‘Facility’ sheets need to be populated;
        • 2. Followed by ‘Floors’ and ‘Zones’;
        • 3. Followed by ‘Spaces
        • 4. Followed by ‘Types’ and ‘Systems’
        • 5.‘Components’.
  5. Key BIM benefits

    • Design
      • improved coordination of design and deliverables between disciplines
      • improved project understanding through visualisation
      • improved design management and control, including change control
      • improved understanding of design changes and implications through parametric modelling.
    • Compliance
    • Costing/economics
      • ability to perform cost analysis as the design develops, and to check for adherence to budget/cost targets
      • ability to understand cost impacts of design changes
      • improved accuracy of cost estimates
    • Construction
      • ability to perform simulation and analysis for regulatory compliance
      • ability to simulate and optimise energy and wider sustainability performance
    • Operation and management

Informações

Descrição
Mapa Mental sobre BIM, criado por alison_patey0437 em 15-04-2013.
Visualizações
74
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?