COSTING SYSTMES

Francia o Cost Accounting A-Level Inglês 5,0Avaliação média 5,0 de 5 (1 avaliação)

COSTING SYSTMES

Conteúdo do mapa

COSTING SYSTMES

  1. Building Blocks:

    • Cost Object: the distinct type of job
    • Direct Cost Pools: traced seperately from indirect cost
    • Indirect Cost Pool: allocated to the cost object
    • Cost Pool: grouping of individual indirect cost items
    • Cost Allocation Base: a systmatic way to link an indirect cost/group of indirect cost to cost objects (#of machine hrs, or labour hrs)
  2. Types of Costing Systmes

    • Job Costing: assigns cost to distinct units of a product or service
    • Process Costing: assign cost to masses of identical/similar units and compute unit costs on an average basis
  3. Evaluating and Implementing Job Costing Systmes

    • 1. Identify the job-> the cost object
      • 2. Identify the direct cost of the object
        • 3. Select the cost-allocation base to use for allocating the I.C to the cost object
          • 4. Identify and add all the I.C into one I.C pool
            • 5. Compute the I.C allocation rate
              • 6. Compute the I.C assigned to the cost object
                • 7. Compute the T.C of the distinct object by adding all DC/IC assigned to the job
  4. Actual Budgeted and Normal costing chart

  5. Adjustments for over-and underallocated cost

    • 1. adjust the allocation base
      • 2. prorate on the basis of the total amount of the allocated MOH cost in the ending blances of WIP, FG, COGS account
  6. Definitions:

    • Source document: the origninal record that supprots journal entries in the accounting systmes
      • Job cost Records/job cost sheet: records and accumulates al the cost assigned to a specific job, strating when the work begins
        • Labour time sheet: contains info about the amount of labour time used for a specific job in spicific dept; source doucment for DML
          • MOH allocted: the amount of MOH allocted to distint types of jobs based on the budgeted rate multiplied by the actual qty of the allocation base used
            • Budgeted MOH: EST MOH/EST BASE
              • Underallocated I.C: occur when the allocated amount of I.C in an accounting period is less than the acutal amount
                • Overallocated I.C: when the allocated amount of I.C in an accounting period is greater than the acutual amount

Imagens e arquivos do mapa

  • COSTING SYSTMES

Informações

Descrição
Ch.4 Job Costing
Criado por
Francia o
Visualizações
337
Avaliação
Avaliação média 5,0 de 5 (1 avaliação)