O GoConqr está de visual novo! Conte para nós o que você achou.

Quiz

Rational Quality Manager v4

mike.smith 37 perguntas

Fazer o quiz

Perguntas do quiz (37)

  1. 1What happens when migrating Rational ClearQuest TestManager product with associated
    automated tests?
    1. AThe Rational ClearQuest projects must be migrated before the automated scripts.
    2. BYou must import or refer to the automated test scripts in IBM Rational Quality Manager before
      migrating your Rational ClearQuest Test
      Manager projects.
    3. CThe order in which project versus automated script migration does not matter.
    4. DAutomated scripts are included when importing Rational ClearQuest Test Manager projects.
  2. 2What is the term for data collection jobs in Rational Quality Manager?
    1. AEnable, Transmission, Load (ETL)
    2. BEnable, Transformation, Lead (ETL)
    3. CExtract, Transform, Load (ETL)
    4. DExtract, Transport, Load (ETL)
  3. 3How does IBM Rational Quality Manager support defect tracking?
    1. AIt has several defect tracking providers including a Change Management solution that is part of
      the rational solution for CLM.
    2. BIt relies only on third-party tools to support defect tracking.
    3. CIt does integration with Bugzilla
    4. DIt has a built-in defect tracking system that can be used in most situations.
  4. 4What is a test script?
    1. Aa collection of tests that are grouped together for execution purposes
    2. Ba documented sequence of actions for the execution of a test
    3. Ca sequence of events in the AUT that is automated only by Rational Functional Tester or Rational
      Performance Tester
    4. Dthe automated steps of a test that must be recorded by Rational Quality Manager
  5. 5How is a manual test script divided in Rational Quality Manager?
    1. Aintroduction, execution, and results
    2. Btasks, conditions, and expected results
    3. Csteps, descriptions, and expected results
    4. Dtests, steps, and defects
  6. 6Which two statements are true about defining categories and category relationships? (Choose
    two.)
    1. ABy assigning categories to your artifacts, you can set up a hierarchical directory structure that will
      keep you organized and help you find
      individual artifacts.
    2. BRequired field is enforced when data comes from external tools such as the Microsoft Excel
      plugin. Required field is enforced when data comes from external tools such as the Microsoft
      Excel plugin.
    3. CBy making a category multi-valued, you enable category value to be modified multiple times.
    4. DCategories cannot have subcategories.
  7. 7As per IBM Rational Quality Manager (RQM) workflow, what are three typical tasks performed by
    the RQM role est Manager?or est Lead?As per IBM Rational Quality Manager (RQM) workflow,
    what are three typical tasks performed by the RQM role ?est Manager?or ?est Lead? (Choose
    three.)
    1. Acreating test cases and test suites
    2. Bdeveloping manual test scripts
    3. Crunning reports
    4. Drunning test cases and test suites
    5. Eidentifying requirements
  8. 8Capturing risks in the test plan results in which two benefits? (Choose two.)
    1. Aprompt, early risk assessment and mitigation planning
    2. Bprovides a basis for test prioritization
    3. Cenables a project manager to decide associations between test plans with requirement collections
    4. Dhelps in defining the quality objectives and test schedules
  9. 9What does the requirements based testing (RBT) process do? (Choose two.)
    1. Avalidate that the requirements are correct, complete, and unambiguous
    2. Bdesign a necessary and sufficient set of test cases from requirements
    3. Censure automatic generation of test scripts from requirement
    4. Dhelp define the quality objectives, and entry and exit criteria of the test plan
  10. 10How does IBM Rational Quality Manager support defect tracking?
    1. AIt has several defect tracking providers including a Change Management solution that is part of
    2. Bthe rational solution for CLM.
    3. CIt relies only on third-party tools to support defect tracking.
    4. DIt does integration with Bugzilla.
    5. EIt has a built-in defect tracking system that can be used in most situations.

Informações

Descrição
Rational Quality Manager v4 PreTest
Idioma
English
Visualizações
225
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?