Question 1

Question
Choose the correct answer(s). What can be found in the SAP Solution Implementation Roadmaps?
Answer
  • Accelerators to be used in the Project Library
  • Detailed description of implementation tasks
  • Value Maps
  • Deliverables in each Phase

Question 2

Question
What can you do with Guided Configuration?
Answer
  • Initial configuration of your solution and recording of updates for continuous innovation
  • Test your configured business processes
  • System conversion
  • Data migration
  • Evaluate activated business processes and country versions

Question 3

Question
There are several SAP options for creating data insights and providing summaries in a structured format for SAP customers, which of the following are part of the SAP Analytics and Reporting Portfolio?
Answer
  • SAP Analytics Cloud
  • SAP S/4HANA Embedded Analytics
  • SAP Process Orchestration
  • SAP Hybrid Solutions (BI/Planning/Predictive
  • SAP Analytics Hub

Question 4

Question
What are the enablement areas relevant for all Customer Team members coming from the Business?
Answer
  • Workstream enablement
  • Solution expertise
  • Technical expertise
  • Project management

Question 5

Question
Custom Code Management process in SAP Solution Manager provides which of the following capabilities?
Answer
  • Define KPIs and report on CCM data
  • Identify custom code and collect its usage statistics
  • Perform static code checks integrated into ABAP Development Tools on security, performance and syntax Replace custom developments with standard functions without necessity of a business process redesign and dedicated project
  • Retire unused/obsolete custom code objects

Question 6

Question
For Cloud-to-Cloud integration scenarios, Process Orchestration (PO) and APIs are the recommended options to be used.
Answer
  • True
  • False

Question 7

Question
Which of the following is true about the Customer Center of Expertise (CCoE)?
Answer
  • CCoE is only involved during the hypercare period in supporting business processes operations.
  • CCoE’s mission is to provide transparency and efficiency of SAP implementation, innovation, operation, and quality of business processes and systems.
  • CCoE is an organization model which serves as collaboration hub across IT and LoBs.
  • CCoE centrally drive continuous improvement and continuous innovation.

Question 8

Question
What are the substreams in the Data Management Workstream?
Answer
  • Data volume management
  • Data aging
  • Data migration
  • Master data management

Question 9

Question
In the SAP S/4HANA Cloud landscape, a Starter System contains configuration and master data for targeted enablement of the Project team on SAP standard processes and is used as the host environment for the Fit-to-Standard workshops.
Answer
  • True
  • False

Question 10

Question
SAP Solution Manager is the default ALM solution for SAP S/4HANA On-Premise implementation scenarios. If it is used in the project then artifact "Solution Manager Design Document" shall be developed during Prepare phase.
Answer
  • True
  • False

Question 11

Question
The activities in the transition path of SAP S/4HANA Cloud, private edition and SAP S/4HANA Cloud are very similar, what are the major differences?
Answer
  • SAP S/4HANA Cloud, private edition is configured through IMG while SAP S/4HANA Cloud through SSCUIs.
  • SAP S/4HANA Cloud, private edition has longer release cycles comparing to SAP S/4HANA Cloud.
  • SAP S/4HANA Cloud, private edition has shorter release cycles comparing to SAP S/4HANA Cloud.
  • Different tools are used to manage Application Lifecycle of SAP S/4HANA Cloud, private edition.

Question 12

Question
What are the approaches for System Conversion to SAP S/4HANA?
Answer
  • Simplification Item Catalog approach
  • Standard approach using Software Update Manager (SUM)
  • Near-Zero Downtime technology (NZDT) approach
  • Downtime-optimized conversion approach using Software Update Manager (SUM)

Question 13

Question
What Kind of benefits are associated with use of the SAP Activate methodology?
Answer
  • Reduced Risks
  • Lower cost
  • Increase adoption
  • All mentioned choices
  • Shorter time to value
Show full summary Hide full summary

Similar

Organizações Tradicionais x Organizações Exponenciais
Roberto Rodrigues
Seriais Área Vermelha
Robson Gonzaga
SAP Simulado
andersonsiuta
Area, Volume & Perimeter Mind Map
rory.examtime
Characteristics and Climate of a hot desert
Adam Collinge
A Level: English language and literature techniques = Lexis
Jessica 'JessieB
Certification Prep_1
Tonya Franklin
Poppies - Jane Weir
Jessica Phillips
MICROSOFT WORD 2013 SKILLS FOR WORK
John O'Driscoll
GCSE AQA Physics 2 Circuits
Lilac Potato
Writing successful GCSE English essays
Sarah Holmes