1What is the New Zealand standard for Conditions of contract for building and civil engineers?
- ANZS 1170.0
- BNZS 3910:2013
- CNZS 3101:2008
2What does the NZS3910 include?
- AStandard form of general conditions of contract for incorporation into construction contract documents
- BIncludes specific provisions on programmes, safety plans, quality plans and traffic management plans
- CAll of the above
3The "schedule of prices" is not known as the "bill of quantities"
- ATrue
- BFalse
4What are the project process a typical engineering project follows in sequence?
- AInception, feasibility, Design, Consenting, Tendering, Construction, Commissioning
- BFeasibility, Inception, Design, Tendering, consenting, Construction, Commissioning
- CCommissioning, Designing, Tendering, Consenting, Inception, Feasibility, Design
5What is tendering?
- AThe contractor must make sure they understand the project works and ensure the price covers all the required works
- BThe contractor has to develop a plan of how the work will be done, what resources are required, and what it will all cost with the contractor,
6What is involved in Pre-establishment?
- ABonds and Insurances
- BSet up meetings
- CProject planning
- DAll of the above
7Project planning is how the works are to be carried out, what resources (plant, equipment and labour) are needed and when, what materials are needed, what materials are required and when they are needed, what subcontractors are required, any other processes that need to be undertaken to complete the works.
- ATrue
- BFalse
8What types of management plans are there for the project?
- ATraffic Management plan
- BEnvironmental Protection plan
- CAnger management plan
- DEating plan
- EHealth and Safety Plan
- FQuality Management Plan
9What is involved in Establishment?
- AContractor given possession of the site by Engineer
- BEstablishing Access
- CConstruction site facilities
- DBringing plant and equipment to site
- EAll of the above
10Site access needs to be designed to ensure construction traffic can safely enter and leave the site.

- ATrue
- BFalse
11Site facilities vary according to project but do not include toilets, workers facilities and storage areas.
- ATrue
- BFalse
12Plant and equipment are readily available and do not need trucks to deliver them
- ATrue
- BFalse
13Tower cranes and other special equipment need special foundations and onsite erection.
- ATrue
- BFalse
14What are the objectives of the preliminary works?
- ASetting out, locating and protecting existing services, Establishing silt control systems, site clearance
- BClear all trees and shrubs off the ground ready for digging
- CMake sure the water table is in the appropriate place and if it isn't shift it before work commences
15Setting out involves putting reference points around the site to allow the works to be constructed in the correct position. The reference points may be :
- APegs- providing temporary points that are easy to see. Identified with clear labels and used to set out different parts of the works. In a location where they wont be disturbed by plant.
- BTemporary bench marks (TBM): provide more permanent reference points across the site. Means the surveyor can set out areas around the site without having to back track to an established BM.
16Pegs are usually wooden stakes where as TBMs are usually iron stakes set into concrete.
- ATrue
- BFalse
17Existing services like pipelines, power, gas and need to be located and protected from damage by the contract works
- ATrue
- BFalse
18Silt control is needed as the land is more prone to erosion when the vegetation is removed, soil washed off the site can end up in local water systems and smother natural flora and fauna.
- ATrue
- BFalse
19Silt control is an optional system to prevent erosion onsite
- ATrue
- BFalse
20What is the TNZ F/1:1997
- ASpecification guidance notes for the construction of earthworks
- Bguidelines for clearing and removal of all obstacles within the limits of earthworks
- Cguidelines for the excavation of all cuts including excavation below the final subgrade surface
- DGuidelines for the excavation of borrow areas, benches and surface drainage facilities
- Eguidelines for carting of the excavated material to fill or waste
- Fguidelines for construction of the fills and subgrade
- Gguidelines for the shaping,trimming, grassing and maintaining of the works
21What is "Bulk Fill" ?

- Aall the material placed in the fill from the ground surface after clearing and removing of top soil
- Bexcavation from outside the construction batter limits shown on the drawings
- Cexcavation within the construction batter limits shown on the drawings and above the final subgrade surface
- Dmaterial which has been placed in the fill and which contains less than 35% passing a 75 micrometer sieve and has a sand equivalent greater than 20
22What is "borrow"?

- Ais excavation from outside the construction batter limits shown on the drawings
- Bis excavation within the construction batter limits shown on the drawings and above the final subgrade surface
- Cis all that material placed in the fill, from the ground surface after clearing and removing of top soil
23What is "cut"?

- AIs the excavation within the construction batter limits shown on the drawings and above the final subgrade surface.
- Bis material which has been placed in the fill and which contains less than 35% passing a 75um sieve and has a sand equivalent greater than 20.
24What is "Granular fill material"?

- Ais material which has been placed in the fill and which contains less that 35% passing a 75um sieve and has a sand equivalent greater than 20
- Bis excavation from outside the construction batter limits shown on the drawings
- Cis all the material placed in the rill from the ground surface after clearing and removing of top soil
25What is "overbreak"?
- Ais the excavated material removed by the contractors operations from outside the construction cut batter limits shown on the drawings but not authorized as borrow
- Bis any igneous, sedimentary, or metamorphic stone which is solidly bonded or cemented together and which occurs in masses, ledges, seams or layers
- Cis an open drainage excavation often at the toe of a fill batter
26What is a "rock"?

- Aany igneous, sedimentary, or metamorphic stone which is solidly bonded or cemented together and which occurs in masses, ledges, seams or layers
- Bis the excavated material removed by the contractors operations from outside the construction cut batter limits shown on the drawings, but not authorised as borrow
- Cis an open drainage excavation often at the toe of a fill batter
- Dis material dislodged by the forces of nature from outside the cut batter limits or from the fill slope shown on the drawings
27What is "side drain"?

- Ais an open drainage excavation often at the toe of a fill batter
- Bis material dislodged by the forces of nature from outside the cut batter limits or from the fill slope shown on the drawings
- Cis the excavated material removed by the contractors operations from outside the construction cut batter limits shown on the drawings but not authorised as borrow
28What is "slip"?

- Ais material dislodged by the forces of nature from outside the cut batter limits or from the fill slope shown on the drawings
- Bis an open drainage excavation often at the toe of a fill batter
- Cis water channel formed at the subgrade surface at the edge of the road
29What is "Subgrade"?

- Athe layer of material in the top 1.0m of construction measured down from the underside of the subbase course
- Bis a water channel formed at the subgrade surface at the edge of the road
- Cis the excavation from just below the subgrade surface. this may be an extension of the depth of cut in a cut area.
30What is a "surface Water Channel"?

- Aa water channel formed at the subgrade surface at the edge of the road
- Bis excavation from just below the subgrade surface. this may be an extension of the depth of cut in a cut area
- Cis that layer of material immediately below the ground surface, which includes vegetation, turf and humus or other organic matter.
31what is "undercut"?
- Ais excavation from just below the subgrade surface. this may be an extension of the depth of cut in a cut area
- Bis the layer of material immediately below the ground surface, which includes vegetation, turf and humus or other organic matter.
- Clayer of material in the top 1m of the construction measured down from the underside of the subbase course
32Top soil is the layer of material immediately below the ground surface, which includes vegetation, turf and humus or other organic matter.
- ATrue
- BFalse
Information
- Description
- Diploma Highway Engineering 1 Quiz on Highway Engineering 1 Lecture 3 , created by Pauline Leota on 12/05/2015.
- Author
- Pauline Leota
- Language
- English
- Views
- 3
- Tags
- Rating
- No ratings yet Rate this quiz