  1. 1 Define a road or road reserve based on Auckland Transport definition.
    1. AThe road, or road reserve, is defined as the area from the property boundary on one side of the road to the property boundary on the other side of the road. This includes the berm (grass verge), footpath and carriageway
    2. Bthe road is defined as the area from the boundary of the property on one side, the grass, footpath, berm, kerb and drain, carraigeway, other kerb and drain, berm, footpath and grass up to the property bounday
  2. 2What is an arterial route?
    1. AA road that mainly carries through traffic from one region to another
    2. Bforms principal avenues of communication for traffic movements
    3. CEncourage roadside development and access that is compatible with the arterial function (i.e not residential more semi-commercial)
    4. DAccess should be prioritized versus access function
  3. 3What is a motorway/ freeway?
    1. AMajor regional and inter-regional movement High speed Efficient and safe movement of vehicles
    2. Busing ramps, variable sign messages, speed controls, lane management and travel time estimation
  4. 4What is a collector/distributor road
    1. ACollects and distribute traffic, incl buses, within residential, commercial and industrial areas. -
    2. BProvide a link for local streets to main arterials. - Need to manage residential pressures to reduce speed overriding the need for traffic movement functions
  5. 5What are local roads?
    1. AProvide vehicle access to developments and residential properties Access for emergency and service vehicles
    2. BPedestrian and cyclist movements Neighbourhood social interactions Aesthetic values to the neighbourhood Speed is to be kept low i.e. 50km hr-1 or less
  6. 6Name 7 factors you would consider when making a new highway alignment?
    1. AKeep grades and curvature to the minimum necessary to satisfy the service requirements of the highway.
    2. BNever have two roads intersecting near a bend or at the top or bottom of a hill
    3. C Always provide adequate sight distance and avoid sudden changes in sight distance, especially near intersections.
    4. DAvoid areas or objects of historical, recreational or cultural significance.
    5. EAvoid having a sharp horizontal curve on or adjacent to a pronounced vertical curve.
    6. FLocate the highway wherever possible along property boundaries not through the middle of blocks of land particularly in farming areas.
    7. G Where it is practical maximise use of existing highway alignment to reduce land purchase costs.
    8. HAll of the above
  7. 7There are two flexible pavement design methods currently being used. Name them and state the difference between the two.
    1. AEmpirical: Based on experiments and experience, can be simple or complex, charts etc.
    2. B Mechanistic-Empirical: Using stresses, strain and deflections caused by loading and material properties on the pavement structure.
  8. 8TNZ F/I: 1997 specification for earthworks construction. Clause 9 refers to Excavation and 9.6 is excavation of ‘Benching’. Discuss two things that must be done on site when ‘Benching’.
    1. A9.6.1 Any portion of the ground whose slope is steeper than three horizontal to one (1V/3H) vertical shall be benched before filling is placed on it, unless otherwise directed by the Engineer.
    2. B9.6.2 Each bench shall be constructed to a width adequate to permit suitable construction equipment to operate on it. The base of the benches shall be sloped inwards at a slope of 12 horizontal to 1 vertical (1V/12H). The longitudinal profile of each bench shall be graded to ensure adequate drainage and safe discharge of water.
  9. 9Earthworks Terminology. Explain what the following terminologies as described in TNZ F/1. "Borrow" "Overbreak" "Surface Water Channel"
    1. A"Borrow" is excavation from outside the construction batter limits shown on the drawings.
    2. B"Overbreak" is the excavated material removed by the Contractor's operations from outside the construction cut batter limits shown on the drawings, but not authorised as borrow.
    3. C"Surface Water Channel" is a water channel formed at the subgrade surface at the edge of the road. (1 mark each)
  10. 10(d) Type A, R1 and R2 are classification of materials in TNZ F1. Briefly describe each of them.
    1. AType A Material is all material which does not fall within categories R1, R2, W, or U.
    2. BType R2 Material This is rock which cannot be productively ripped unless equipment is used which is more powerful than a crawler tractor having net engine (or flywheel) power in the range 270310 kW and fitted with a single shanked hydraulic ripper. If a tractor meeting the above specification is not readily available then, a 30 tonne hydraulic excavator with a single ripper on the boom may be used to determine R2 materials, providing the performance of the hydraulic excavator has been compared with a crawler tractor in similar materials.
    3. CType R1 Material This is rock which cannot be productively ripped unless equipment is used which is more powerful than a crawler tractor having net engine (or flywheel) power in the range 100115 kW and fitted with a twin shanked hydraulic ripper. If a tractor meeting the above specification is not readily available then, a 30 tonne hydraulic excavator using a bucket may be used to determine R1 materials. Alternatively, a smaller excavator with a single tyne ripper may be used providing its performance has been compared with a crawler tractor in similar materials.

Information

Description
Diploma Highway Engineering 1 Quiz on highway engineering 1 test, created by Pauline Leota on 13/05/2015.
Language
English
Views
7
Tags
highway engineering 1testquizhighway engineering 1 diploma
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What should we add next?